Warming things up…Dialing in your comfort…Almost cozy…
Reliable Heating and Cooling Solutions – Quality Service, Fair Prices, Guaranteed Satisfaction!

Rinnai Boiler: Gas conversion safety precautions

Updated · by Aurora Star Tech Inc.

Gas conversion safety precautions on a Rinnai boiler: Some PC board areas carry 120 V AC. Do not touch any area of the PC board other than the described buttons while power is on. Keep clear of the heat exchanger and hot water lines, which can cause burns. Conversion must be checked in operation before the job is complete.

Homeowner with a boiler problem? Call (647) 657-2977 or book a service call — licensed technicians across Vaughan and the GTA.

Applies to: I-Series Plus condensing combi boiler

How to fix gas conversion safety precautions: step by step

  1. Shut off gas and disconnect power before opening the PC board for conversion.
  2. Check the converted appliance operates correctly as the kit instructions specify before handing over.
Safety: Gas, electrical and refrigerant work must be done by a licensed technician. Turn off power and gas before servicing, never bypass a safety control, and always follow the manufacturer's manual for your exact model.

If the unit shows an error code, look it up: Rinnai Boiler codes

More other tips for boiler

Source: Rinnai I-Series Plus IP060160C installation and operation manual, p. 131. Written in our own words as a summary; always check the original manual.

General guidance for qualified technicians. The manufacturer's installation and service manual and local codes always take priority. Aurora Star Tech is not affiliated with, endorsed by or sponsored by any equipment manufacturer; brand and model names are used only to identify equipment and belong to their owners.

Emergency Boiler Repair

647-657-2977