Warming things up…Dialing in your comfort…Almost cozy…
Reliable Heating and Cooling Solutions – Quality Service, Fair Prices, Guaranteed Satisfaction!

Rinnai Boiler: Combustion analysis port access

Updated · by Aurora Star Tech Inc.

Combustion analysis port access on a Rinnai boiler: Combustion analysis must be done by a trained and qualified professional. The CO2 or O2 reading is taken in the exhaust with the boiler held at forced high or low fire.

Homeowner with a boiler problem? Call (647) 657-2977 or book a service call — licensed technicians across Vaughan and the GTA.

Applies to: I-Series Plus condensing combi boiler

How to fix combustion analysis port access: step by step

  1. Remove the front panel by removing the two screws that hold it.
  2. Remove the clamp holding the combustion analysis port cap.
  3. Remove the cap and insert the gas analyzer probe into the port.
  4. Put the boiler into forced high fire or low fire as needed (see section 12.12 Forced Hi/Low Fire Modes).
  5. Measure CO2 or O2 in the exhaust.
  6. Remove the probe, refit the cap and clamp, then reinstall the front panel with the two screws.
Safety: Gas, electrical and refrigerant work must be done by a licensed technician. Turn off power and gas before servicing, never bypass a safety control, and always follow the manufacturer's manual for your exact model.

If the unit shows an error code, look it up: Rinnai Boiler codes

More service & test modes tips for boiler

Source: Rinnai I-Series Plus IP060160C installation and operation manual, p. 137. Written in our own words as a summary; always check the original manual.

General guidance for qualified technicians. The manufacturer's installation and service manual and local codes always take priority. Aurora Star Tech is not affiliated with, endorsed by or sponsored by any equipment manufacturer; brand and model names are used only to identify equipment and belong to their owners.

Emergency Boiler Repair

647-657-2977