Warming things up…Dialing in your comfort…Almost cozy…
Reliable Heating and Cooling Solutions – Quality Service, Fair Prices, Guaranteed Satisfaction!

Rinnai Boiler: Start deaeration on the PC board

Updated · by Aurora Star Tech Inc.

Start deaeration on the PC board on a Rinnai boiler: Deaeration purges air from the boiler and system after filling or service. Use the SW2 button on the PC board, or the control panel on first install.

Homeowner with a boiler problem? Call (647) 657-2977 or book a service call — licensed technicians across Vaughan and the GTA.

Applies to: I-Series Plus IP060160C

How to fix start deaeration on the pc board: step by step

  1. Press and hold the SW2 button on the PC board.
  2. Wait for the Maintenance Mode icon to show on the controller. Deaeration starts.
  3. On first install you can instead press and hold the DHW button, then press the CH button at the same time, without removing the front panel.
Safety: Gas, electrical and refrigerant work must be done by a licensed technician. Turn off power and gas before servicing, never bypass a safety control, and always follow the manufacturer's manual for your exact model.

If the unit shows an error code, look it up: Rinnai Boiler codes

More service & test modes tips for boiler

Source: Rinnai I-Series Plus IP060160C installation and operation manual, p. 69-70. Written in our own words as a summary; always check the original manual.

General guidance for qualified technicians. The manufacturer's installation and service manual and local codes always take priority. Aurora Star Tech is not affiliated with, endorsed by or sponsored by any equipment manufacturer; brand and model names are used only to identify equipment and belong to their owners.

Emergency Boiler Repair

647-657-2977