Rinnai Boiler: Gas conversion safety precautions
Gas conversion safety precautions on a Rinnai boiler: Some PC board areas carry 120 V AC. Do not touch any area of the PC board other than the described buttons while power is on. Keep clear of the heat exchanger and hot water lines, which can cause burns. Conversion must be checked in operation before the job is complete.
Applies to: I-Series Plus condensing combi boiler
How to fix gas conversion safety precautions: step by step
- Shut off gas and disconnect power before opening the PC board for conversion.
- Check the converted appliance operates correctly as the kit instructions specify before handing over.
If the unit shows an error code, look it up: Rinnai Boiler codes
Source: Rinnai I-Series Plus IP060160C installation and operation manual, p. 131. Written in our own words as a summary; always check the original manual.
General guidance for qualified technicians. The manufacturer's installation and service manual and local codes always take priority. Aurora Star Tech is not affiliated with, endorsed by or sponsored by any equipment manufacturer; brand and model names are used only to identify equipment and belong to their owners.