Weil-McLain Boiler: Solvent-cement joints in concentric termination assembly
Solvent-cement joints in concentric termination assembly on a Weil-McLain boiler: Assemble the termination dry first, then cement each joint in the correct order. Too much cement inside a socket can build up and block the air passages.
Applies to: Concentric termination assembly, 3 in or 4 in
How to fix solvent-cement joints in concentric termination assembly: step by step
- Deburr the inside and outside of each pipe end.
- Chamfer the outside of each pipe end so cement spreads evenly.
- Clean all pipe ends and fittings, then let them dry thoroughly.
- Dry-fit the whole vent or air assembly before cementing any joint.
- Brush primer on both the pipe end and the fitting socket while it is liberal.
- While the primer is still damp, apply cement to both surfaces, then a second coat.
- Insert the pipe fully into the fitting while the cement is wet, twisting about 1/4 turn.
- Handle fittings carefully to keep the joint surfaces clean.
If the unit shows an error code, look it up: Weil-McLain Boiler codes
Source: Ultra Series 4 boiler manual, p. 76. Written in our own words as a summary; always check the original manual.
General guidance for qualified technicians. The manufacturer's installation and service manual and local codes always take priority. Aurora Star Tech is not affiliated with, endorsed by or sponsored by any equipment manufacturer; brand and model names are used only to identify equipment and belong to their owners.