Warming things up…Dialing in your comfort…Almost cozy…
Reliable Heating and Cooling Solutions – Quality Service, Fair Prices, Guaranteed Satisfaction!

Other: Boiler tips (part 44 of 45)

Updated · by Aurora Star Tech Inc.

Short, practical technician tips on other for boiler. Check each one against the manual for your exact model before acting.

Secure the boiler door after servicing

Weil-McLain · Ultra 80, 105, 155, 230, 299, 399

The door must be fastened to stop the boiler drawing air from the boiler room, which matters most when other appliances share the room.

  1. Reinstall the boiler door after servicing and fasten it securely.

Secure the front door after any service

Weil-McLain · Ultra Series 4 gas-fired water boiler

The front door must be fastened tightly so the boiler does not draw air from the boiler room.

  1. Reinstall the jacket front door after servicing.
  2. Make sure the door is securely fastened to the boiler.
  3. If the door does not sit correctly or the door gaskets are damaged, contact the installer or technician immediately.

Service safety: power off and cool down

Weil-McLain · All service work

Disconnect all electrical supplies before maintenance to avoid electric shock. Let the boiler cool before maintenance to avoid burns. The boiler contains ceramic fiber and fiberglass material, so follow the handling warning on page 91.

  1. Disconnect all electrical power to the boiler before servicing.
  2. Allow the boiler to cool before servicing.
  3. Follow the ceramic fiber and fiberglass handling instructions.

Set date and time

Weil-McLain · Unity control, SVF Series 1

Set the date and time in the SET TIME & DATE menu. Fault occurrences are time- and date-stamped, so the clock must be correct for lockout history to be useful.

  1. Open the SET TIME & DATE menu from the main menu.
  2. Enter the current date and time.

Set outputs to CAD interlock mode

Weil-McLain · Evergreen 110/155/220/299/300/399

When Input 3 is used with a CAD, set the output mode so the damper opens on every call to fire.

  1. Assign Input 3 as AUX PUMP/OUTPUT.
  2. Set the operating mode to local or System Damper.
  3. Confirm Output 3 supplies 120VAC to the damper motor.

Set user mode to Basic before setup

Weil-McLain · Unity control, SVF Series 1

Screens in this section assume USER MODE is BASIC, which is the default. Advanced options are in the separate Advanced Manual.

  1. Confirm USER MODE is set to BASIC.
  2. Use the Advanced Manual for multi-boiler networks or advanced features.

Sidewall direct exhaust termination assembly

Weil-McLain · SVF 1500-3000 Series 1, direct exhaust sidewall

Sidewall terminations use a down-turned 90-degree elbow and vent manufacturer stop plates so the vent cannot be pushed inward.

  1. Cut the vent hole at least 3/8 in larger than the vent pipe diameter for combustible construction, or as the vent maker specifies.
  2. Insert a corrosion-resistant metal thimble in the hole.
  3. Install vent manufacturer stop plates with holes just larger than the vent pipe; get them only from the vent manufacturer.
  4. Insert the last vent pipe length from outside until its female shoulder rests on the outer stop plate.
  5. Insert the down-turned 90-degree termination elbow and install a bird screen in its open end.
  6. Seal exterior openings thoroughly with exterior caulk.

Single combustion air opening and large space exception

Weil-McLain · Ultra direct exhaust boiler rooms

One combined opening or no openings can be used in some cases, but only under the conditions below.

  1. For a single opening, make sure it opens directly to outdoors, or to a space that opens directly to outdoors, not to an interior space.
  2. Put the top of the single opening within 12 inches of the ceiling.
  3. Make the free area at least equal to the total area of all equipment vent connectors in the space.
  4. For large spaces, total the input of all appliances in MBH and multiply by 50 to get the minimum room volume in cubic feet.
  5. Use no openings only if the room volume meets that minimum and the building is not of tight construction.
  6. Example: 1500 MBH with an 8 foot ceiling needs 60,000 cubic feet (50 x 1500 x 8).

Slope, clearance and sealing of vent and air piping

Weil-McLain · Ultra vent and air piping

Keep vent and air piping sloped back to the boiler with no sags, keep combustible materials away from the vent, and seal wall and floor openings.

  1. Slope vent and air piping continuously toward the boiler, at least 1/4 inch drop per foot of run.
  2. Keep at least 3/16 inch clearance between the vent pipe and any combustible wall or material.
  3. Seal wall and floor penetrations following local code.

Solvent-cement joints in concentric termination assembly

Weil-McLain · Concentric termination assembly, 3 in or 4 in

Assemble the termination dry first, then cement each joint in the correct order. Too much cement inside a socket can build up and block the air passages.

  1. Deburr the inside and outside of each pipe end.
  2. Chamfer the outside of each pipe end so cement spreads evenly.
  3. Clean all pipe ends and fittings, then let them dry thoroughly.
  4. Dry-fit the whole vent or air assembly before cementing any joint.
  5. Brush primer on both the pipe end and the fitting socket while it is liberal.
  6. While the primer is still damp, apply cement to both surfaces, then a second coat.
  7. Insert the pipe fully into the fitting while the cement is wet, twisting about 1/4 turn.
  8. Handle fittings carefully to keep the joint surfaces clean.

Spacing between multiple vent or air terminations

Weil-McLain · Multiple Ultra boilers, direct vent

When several Ultra boilers share a wall or roof, each vent and air connection needs its own termination, spaced as below.

  1. Terminate each vent and air connection separately; do not common vent.
  2. Keep adjacent vent terminations at least 6 inches apart.
  3. Keep adjacent air inlets at least 6 inches apart.
  4. Combustion air piping may be manifolded; vent piping may not.
  5. Build wall penetrations to meet minimum clearances in this manual.

Spill switch has cut off gas flow

Weil-McLain · CGa, EG, PEG and LGB Series 2 boilers

The spill switch cuts gas flow if the vent system becomes blocked. The boiler must not be restarted until a service technician has checked it.

  1. Do not attempt to place the boiler in operation
  2. Call a service technician immediately

Standard and optional equipment

Weil-McLain · EG and PEG Series 7 boilers

Standard equipment differs for EG/PEG boilers, EG water boilers and EG/PEG steam boilers. Use this list to confirm what should be on a boiler when servicing it.

  1. EG/PEG boilers: combination gas valve for 24 volt, rollout thermal fuse element, spill switch, and on the highest efficiency models a PID intermittent electronic ignition with automatic vent damper.
  2. EG water boilers: Unity-CI ignition module, temperature/LWCO sensor, built-in air eliminator, 30 PSI relief valve, combination pressure temperature gauge, and 50 VA transformer.
  3. EG/PEG steam boilers: 15 PSI relief valve, steam pressure gauge, high-limit pressure control, syphon, gauge cocks, gauge glass, probe-type low-water cutoff, and 40 VA transformer.
  4. Standard on all: factory-assembled section block, insulated extended jacket, draft hood, aluminized steel burners, non-linting pilot burner, heater cover plates (for boilers with tankless heater openings), control wire, and electrical junction box.
  5. EG additional equipment: water tankless heater kits and steam tankless heater kits (EG-35 to EG-75).

Steam boiler water chemistry limits

Weil-McLain · EG / PEG steam boilers

Chlorides above 200 ppm accelerate water-side corrosion. Treatment should be considered if chloride in makeup water is above 30 ppm. Chloride above 400 ppm or TDS above 1000 ppm requires drain and refill.

  1. If chloride is above 200 ppm, expect accelerated water-side corrosion and consider treatment.
  2. If makeup water chloride is above 30 ppm, consider boiler water treatment.
  3. If there is no chemical treatment and chloride is above 400 ppm or TDS is above 1000 ppm, drain and refill with fresh water.
  4. After refilling, bring the boiler to pressure for 15 minutes to drive off excess oxygen.

Support vent and air piping so it does not load the boiler

Weil-McLain · Vertical concentric and vent/air installs

Vent and air piping must be securely supported and must not rest its weight on the boiler fittings. Improper support can damage the vent piping.

  1. Support vent and air piping independently of the boiler.
  2. Do not drill or screw into vent or air pipe or fittings.
  3. Wrap the open end of the assembly with plastic while inserting it through the roof to keep debris out.

Tankless heater application limits

Weil-McLain · EG boilers with optional tankless heater

EG boilers can be ordered with a tankless heater only as factory-installed optional equipment. Standard boilers cannot be adapted. The heater can only be used in a steam boiler or forced hot water system.

  1. Confirm the boiler was ordered with the factory tankless heater option.
  2. Install the heater only in a steam boiler or forced hot water system.
  3. Install the piping as shown in Figure 26 for water boilers or Figure 27 for steam boilers.
  4. Install an automatic mixing valve per the mixing valve maker's instructions.
  5. Install a flow regulating valve sized to the heater's intermittent draw from Table 10.
  6. Install the operating control (small differential recommended) in the temperature control tapping in the heater plate.
  7. In hard water areas, soften the cold domestic supply to the heater to prevent lime buildup.
  8. Use brass plugs in tees and crosses to make cleaning easier in hard water areas.

Tight construction and air movers

Weil-McLain · Boiler rooms with inside air combustion

Tight buildings and exhaust fans can starve the boiler room of combustion air.

  1. Check whether the building meets the tight construction definition (vapor retarder, gasketed openings, weatherstripping, caulking).
  2. If tight, provide air openings from outside sized per Figure 96.
  3. Size openings for the exhaust fan or air mover flow rate as well as firing rate.
  4. Do not let the appliance space go under negative pressure unless all appliances are direct vent.

Tight construction requires outside air openings

Weil-McLain · SVF 1500-3000 Series 1

Buildings with continuous vapor retarder, weather-stripped openings and sealed penetrations are considered unusually tight. In these buildings, outside air openings into the building must be sized for the appliances.

  1. Check whether the building meets the tight construction definition in the National Fuel Gas Code.
  2. If tight, size outside air openings per Figure 26 or Figure 33 for the case that applies.

Tighten heat exchanger cover nuts to torque sequence

Weil-McLain · Ultra Series 4 boilers, heat exchanger cover plate

Cover plate nuts must be tightened gradually, in the sequence shown, to a limited final torque.

  1. Tighten in two or three passes using a torque wrench.
  2. Follow Figure 126 for Ultra-80 and -105, or Figure 128 for Ultra-155 through -399.
  3. Do not exceed 50 in-lb (±10 in-lb) final torque.

Tools for troubleshooting

Weil-McLain · Ultra 80, 105, 155, 230, 299, 399

Tools recommended for troubleshooting Ultra boilers (Figure 122).

  1. #2 Phillips screwdriver: remove 4 screws for the top front cover.
  2. U-Control screwdriver or 1/16 in. flat blade: terminal block wiring.
  3. 1/8 in. Allen wrench: add orifice when changing natural to propane.
  4. 7 mm nut driver (155/230/299/399) or #2 Phillips (80/105): change the burner.
  5. 11 mm nut driver: remove the burner front cover plate.
  6. 4 mm long Allen wrench: remove the blower from the heat exchanger.
  7. Multimeter, manometer (incline or digital), combustion analyzer, contact thermometer.
  8. Keep maintenance kit 383-500-605 (80/105) or 383-500-620 (155/230/299/399) on hand for annual service.

Tools needed for flue side service

Weil-McLain · ECO Tec Series 3 boilers

Tools for opening the flue side and accessing the burner: long-handled #20 Torx driver for burner screws, 3mm Allen wrench for ignition electrode screws, 8mm wrench for blower lock nuts, 10mm wrench or socket for heat exchanger cover nuts, torque wrench, large crescent wrench and pipe wrench for gas valve removal, and a flathead screwdriver.

Tools needed for install and maintenance

Weil-McLain · ECO Tec Series 3 install and maintenance

Tools listed for install (I) and maintenance (M) work on the ECO Tec Series 3.

  1. Have a flat blade and Phillips screwdriver, 5/16 in socket and 2.5 and 4 mm Allen wrenches for install and gas valve work.
  2. Have a 3 mm Allen wrench for ignition electrode screws (maintenance).
  3. Have an 8 mm wrench for the blower and a 10 mm wrench for the heat exchanger cover plate (maintenance).
  4. Have a T20 long-handled Torx driver for burner screws and mixer/venturi (maintenance).
  5. Have a large crescent wrench for the gas valve (maintenance).
  6. Have a multimeter to check sensors and electrical parts (maintenance).
  7. Have an inclined or digital manometer to measure INLET gas pressure (install and maintenance).
  8. Have a digital combustion analyzer for combustion testing and adjustments (install and maintenance).
  9. Have a contact thermometer to check heat exchanger and pipe surface temperatures (install and maintenance).
  10. Have pipe wrenches for gas train installation (install and maintenance).
  11. Always keep the maintenance kit on hand for maintenance work in case parts need replacing.

Tools needed for installation and service

Weil-McLain · EG / PEG Series 7 boilers

Standard hand tools are needed for this boiler: a 1/16" flat blade screwdriver for terminal block wiring, a flat blade screwdriver for the gas valve adjustment, a 5/16" socket for the burner access shield, a Phillips screwdriver for jacket screws, pipe wrenches for the gas train, and an inclined or digital manometer to measure incoming gas pressure.

Troubleshooting tools and kits

Weil-McLain · 80/110/150/199 Series 3

Tools recommended for troubleshooting the ECO Tec boiler, with their purposes.

  1. Phillips screwdriver #2: multiple uses.
  2. 5 and 4mm Allen wrench: adjust gas valve settings.
  3. 3mm Allen wrench: remove ignition electrode screws.
  4. 8mm wrench: remove blower.
  5. 10mm wrench: remove heat exchanger cover plate.
  6. T20 long-handled Torx driver: remove burner screws and mixer/venturi.
  7. Large crescent wrench: remove gas valve.
  8. Multimeter: measure sensors and electrical components.
  9. Manometer (inclined or digital): measure INLET gas pressure to the boiler.
  10. Combustion analyzer (digital preferred): combustion testing and adjustments.
  11. Contact thermometer: check surface temperatures of heat exchanger and pipes.
  12. Maintenance kit: always keep on hand in case replacement is needed.

Turn off all power before servicing

Weil-McLain · Ultra 80, 105, 155, 230, 299, 399

The boiler ON/OFF switch does not cut all power. Internal wiring stays live when the switch is off.

  1. Turn off all power to the boiler at the external switch or breaker before servicing.
  2. Label all wires before disconnecting control wiring.
  3. Never jumper a device except for momentary testing.

Turn power off before service and label wires

Weil-McLain · ECO Tec series 3 80/110/150/199

Power must be off before servicing or making connections to prevent electrical surges that can damage components. Label all wires before disconnecting them.

  1. Turn power off to the boiler before servicing or making connections.
  2. Label every wire before disconnecting it.
  3. Verify wiring after reconnecting to avoid unsafe operation.

Two types of lockouts

Weil-McLain · EG and PEG Series 7 boilers

The control has manual reset lockouts, which need the operator to reset them at the display, and automatic reset lockouts, which clear by themselves once the fault condition goes away.

  1. For a manual reset lockout, go to the reset screen and answer the reset question.
  2. For an automatic reset lockout, correct the condition and wait for the control to clear it.

U-Control display colors and symbols

Weil-McLain · U-Control on Ultra Series 4

Blue means space heating, purple means DHW, and red means maintenance or an error. A wrench symbol shows that scheduled maintenance is due. An exclamation mark shows that a problem was detected. A flashing display is a lockout.

  1. Blue: space heating call.
  2. Purple: DHW call.
  3. Red toggling between graphic and maintenance screens: maintenance due, shown during standby only.
  4. Red with exclamation mark: error or limit event.
  5. Flashing red: lockout; check the three screens (Figure 124, page 117).

U-Control display colours and symbols

Weil-McLain · U-Control on Ultra Series 4

Blue means space heating or a button was pressed. Purple means DHW. Red means an error or limit event. A solid red screen with the exclamation mark is a non-shutdown failure such as an outdoor or system sensor. A flashing red display means lockout and needs attention to restart. A wrench symbol means maintenance is due and shows only in standby.

  1. Blue backlight: space heating active or a button was pressed.
  2. Purple backlight: DHW heating.
  3. Red backlight with exclamation mark: non-shutdown failure, boiler still runs.
  4. Flashing red display: lockout, check the boiler before restarting.
  5. Wrench symbol: maintenance date reached, tell the homeowner to call for service.

Ultra-399 propane conversion uses the gas valve throttle screw

Weil-McLain · Ultra-399

The Ultra-399 is converted by adjusting the gas valve throttling screw rather than changing the orifice. A flue gas analyzer is required to set the valve correctly. Improper settings can cause severe injury, death or property damage.

  1. Use a flue gas analyzer to set the gas valve throttling screw.
  2. Follow the Ultra-399 throttle adjustment procedure on page 41 of the manual.
Safety: Gas, electrical and refrigerant work must be done by a licensed technician. Turn off power and gas before servicing, never bypass a safety control, and always follow the manufacturer's manual for your exact model.

General guidance for qualified technicians. The manufacturer's installation and service manual and local codes always take priority. Aurora Star Tech is not affiliated with, endorsed by or sponsored by any equipment manufacturer; brand and model names are used only to identify equipment and belong to their owners.

Emergency Boiler Repair

647-657-2977