Warming things up…Dialing in your comfort…Almost cozy…
Reliable Heating and Cooling Solutions – Quality Service, Fair Prices, Guaranteed Satisfaction!

Weil-McLain Boiler: Multiple boiler vent terminations

Updated · by Aurora Star Tech Inc.

Multiple boiler vent terminations on a Weil-McLain boiler: Each boiler vent connection is terminated separately using the clearances in the manual. Canadian installs need additional code clearances and a ULC S636 kit.

Homeowner with a boiler problem? Call (647) 657-2977 or book a service call — licensed technicians across Vaughan and the GTA.

Applies to: SVF 1500-3000 Series 1, multiple boilers

How to fix multiple boiler vent terminations: step by step

  1. Terminate each vent connection as described in the manual; see Figure 30 (page 37) for typical sidewall layout.
  2. Place wall penetrations to give the minimum clearances in Figure 29 (U.S.) or the CAN/CSA B149.1 clearances (Canada).
Safety: Gas, electrical and refrigerant work must be done by a licensed technician. Turn off power and gas before servicing, never bypass a safety control, and always follow the manufacturer's manual for your exact model.

If the unit shows an error code, look it up: Weil-McLain Boiler codes

More other tips for boiler

Source: Weil-McLain SVF Series 1 boiler manual, p. 34, p. 36, p. 37. Written in our own words as a summary; always check the original manual.

General guidance for qualified technicians. The manufacturer's installation and service manual and local codes always take priority. Aurora Star Tech is not affiliated with, endorsed by or sponsored by any equipment manufacturer; brand and model names are used only to identify equipment and belong to their owners.

Emergency Boiler Repair

647-657-2977