Other: Boiler tips (part 42 of 45)

Updated · by Aurora Star Tech Inc.

Short, practical technician tips on other for boiler. Check each one against the manual for your exact model before acting.

High altitude propane orifice above 5,500 ft

Weil-McLain · All Ultra boilers installed above 5,500 ft

Installations above 5,500 feet need the special-order high altitude propane orifice kit. The orifice stamping must match the boiler size.

  1. Confirm the installation altitude before ordering the orifice.
  2. Order the high altitude propane orifice kit for altitudes above 5,500 ft.
  3. Check that the orifice stamping matches the boiler size before installing it.

How priority timing and boost work

Weil-McLain · ECO Tec Series 3 priority menus

BOOST TIME raises the target up to 10°F each time a call for heat lasts longer than the set time, capped at MAX TARGET TEMP. SYSTEM OFF DIFF is how far above target the water must rise to turn the boiler off. SYSTEM ON DIFF is how far below target it must drop before network modulation starts. BOILER ON/OFF DIFF set the boiler's own cycling around target or Boiler Max. MAX ON TIME limits how long the boiler runs on a priority while another priority is calling. MIN ON TIME holds the boiler on a priority before it can drop to a lower one; a new higher priority overrides it immediately.

Identify propane-ready boilers

Weil-McLain · Ultra-80 through Ultra-399

Boilers with an LP suffix after the model number are built for propane. All other Ultra boilers must be converted before running on propane.

  1. Check the model number on the rating plate for an LP suffix.
  2. If there is no LP suffix, convert the boiler with the propane orifice before startup.

Input derate for vent length and altitude

Weil-McLain · ECO Tec Series 3 boilers

Input de-rates automatically as vent/air pipe length increases because of pipe pressure loss. Use the derate table for the maximum length. For shorter runs: derate = listed % times vent length divided by 100 (199 with 2 in venting: 13 % times vent length divided by 50). For altitude from sea level to 2,000 ft, no change is needed; the boiler derates itself about 4 % per 1,000 ft above sea level.

Inside air vs direct vent decision

Weil-McLain · SVF 1500-3000 Series 1

The boiler may use inside air only if the boiler space has no contaminants. If contaminants are likely, install it as a direct vent appliance.

  1. Check the boiler space for contaminants before choosing inside air.
  2. If contaminants are likely, plan a direct vent installation with outside combustion air ducted to the boiler.

Inspect burners on PEG boilers

Weil-McLain · PEG-30 through PEG-65

PEG boilers ship factory assembled, but burners and base panels should still be checked before use.

  1. Remove the access panel (Figure 12).
  2. Inspect the burners using step 6 of the burner drawer procedure (page 16).
  3. Reinstall the access panel.

Install piping unions near the boiler

Weil-McLain · All ECO Tec Series 3 boilers

Installing 1 in NPT piping unions on the boiler outlet and return makes future service easier. Unions are not included with the boiler.

  1. Buy 1 in NPT unions separately.
  2. Install unions on the boiler outlet and return.

Installer conversion label

Weil-McLain · ECO Tec gas conversion

After any propane or natural gas conversion, complete the label from the kit and attach it next to the rating label on the right side of the cabinet.

  1. Fill in the conversion date, combustion CO2 and CO, technician name, address and kit part number.
  2. Attach the label next to the rating label.

Keep contaminants out of the combustion air

Weil-McLain · ECO Tec Series 3 combustion air intake

Contaminated combustion air will damage the boiler. Do not pipe combustion air from areas with the contaminants listed below.

  1. Do not draw air near swimming pools, laundry exhaust, dry cleaning, beauty shops, auto body, plastics or metal fabrication, photo processing, refrigeration repair, or remodeling and construction areas.
  2. Keep chloro/fluorocarbon sprays, permanent wave solutions, chlorinated waxes, pool chemicals, calcium or sodium chloride, refrigerant leaks, paint or varnish removers, hydrochloric/muriatic acid, cements and glues, fabric softeners, chlorine bleaches and solvents, and building adhesives away from the intake.
  3. Keep the intake clear of excessive dust and dirt.

Key boiler components and what they do

Weil-McLain · ECO Tec Series 3 80/110/150/199 boilers

Reference for the main parts a technician will see on the ECO Tec Series 3 boiler. Item numbers match the manual's component drawing.

  1. Blower (item 3): pulls air through the silencer and venturi and pushes it to the burner through the cover plate.
  2. Gas valve (item 4): references cabinet pressure and opens gas flow when the control applies power. It has an on/off switch for shutdown or service.
  3. Venturi (item 6): creates negative pressure to draw gas into the air stream before the blower.
  4. Boiler circulator (item 7): moves hot water from the boiler to the heating system or the brazed plate heat exchanger.
  5. Boiler out dual sensor (item 8): controls firing rate to hit the outlet target temperature.
  6. Boiler in sensor (item 9): control may reduce input if the in/out temperature difference is too large.
  7. Air pressure switch (item 19): monitors maximum flue pressure.
  8. Flue gas temperature sensor (item 30): control shuts the boiler down if flue gas gets too hot.
  9. Ignition electrode/flame sensor (item 28): high voltage across the electrode creates the spark; after ignition it reads the flame signal.
  10. Transformer (item 31): 120V to 24V for low voltage controls. Do not splice wiring into it.
  11. Condensate tube (item 24) and condensate trap assembly (item 25): field-installed trap connects to the condensate tube.

Large space exception for combustion air openings

Weil-McLain · SVF 1500-3000 Series 1

No combustion air openings are needed if the space volume is at least 50 cubic feet per 1,000 Btuh of all appliances in the space and the building is not tight construction.

  1. Total the input of all appliances in MBH (thousands of Btuh).
  2. Multiply the total by 50 to get the minimum room volume in cubic feet.
  3. Confirm the building is not tight construction.
  4. Example from manual: 1500 MBH with 8 ft ceiling needs 50 x 1500 = 75,000 cubic feet.

LGB Series 2 component locations

Weil-McLain · LGB Series 2 boiler

Numbered components on the LGB Series 2 diagram. Items 20 to 22 are shown separately from the main diagram.

  1. Gas valve
  2. Pilot burner (with flame sense)
  3. Main burners
  4. Gas manifold/orifices
  5. Control module
  6. Inducer (with vent adapter)
  7. Transformer
  8. Air pressure switch
  9. Low water cutoff (steam shown)
  10. Limit control(s)
  11. Gauge (pressure or pressure/temperature)
  12. Gauge glass (steam only)
  13. Water temperature/LWCO sensor (water only)
  14. Main flame sense
  15. Flue temperature switch

LGB Series 3 component locations

Weil-McLain · LGB Series 3 boiler

Numbered components on the LGB Series 3 diagram.

  1. Gas valve
  2. Pilot burner
  3. Main burners
  4. Gas manifold/orifices
  5. Control module
  6. Vent damper
  7. Transformer
  8. Spill switch
  9. Rollout thermal fuse element
  10. Low water cutoff (steam boilers)
  11. Limit control(s)
  12. Draft hood
  13. Gauge (pressure or pressure/temperature)
  14. Gauge glass (steam only)

Lock the screen for cleaning

Weil-McLain · ECO Tec control

The CLEAN function locks the display so presses are ignored while the screen is wiped.

  1. Open MENU and select CLEAN.
  2. Clean the screen within the 10 second lock period.

Low water cutoff test

Weil-McLain · Ultra Series 4 boilers with a low water cutoff

If the system has a low water cutoff, test it during the heating season using the cutoff manufacturer's instructions.

  1. Test the low water cutoff periodically during the heating season, following the cutoff manufacturer's instructions.
  2. Reset the boiler control after the test.

Maintenance log: columns to record

Weil-McLain · ECO Tec Series 3 boilers

Log each visit with these columns: date, high fire / low fire, O2, CO, CO2, stack temperature, pH, action taken, and technician.

Maintenance reminders and contractor contact screen

Weil-McLain · ECO Tec Series 3 boilers with Unity 2.0 control

The control gives the homeowner automatic maintenance reminders and a contractor-contact screen showing the service professional's information.

  1. Confirm the maintenance reminder is set on the control at commissioning.
  2. Enter the service contractor's contact information on the contractor screen.

Maintenance screen: record installer and service interval

Weil-McLain · Series 2 boilers with Evergreen Pro control

The maintenance screen stores contractor data and the maintenance schedule.

  1. Enter the installer name and contact data in the maintenance screen.
  2. Check the last maintenance date, the interval set (example shows 12 months), and the last calibration date.
  3. Use the rotate and interval values to plan the next service.

Manifolded combustion air for multiple boilers

Weil-McLain · Multiple Ultra boilers using a common combustion air manifold

Several boilers may share one combustion air duct, but vent pipes must never be combined.

  1. Only air piping may be combined. Do not combine vent piping; flue gas leakage and component damage can occur.
  2. Each boiler must have its own individually routed and terminated vent.
  3. Size the duct: minimum area in square inches = total MBH input divided by 2 (example: six Ultra-155 = 930 MBH, minimum 465 sq in).
  4. Provide at least 1 sq in of free area per 2,000 Btuh total input, adjusted for louver restriction.
  5. Keep 12 in minimum above grade or snow line, and at least 3 ft below any vent termination within 10 ft.
  6. If a combustion air damper is used, wire it so the boilers cannot fire until the damper is open.

Manifolded combustion air sizing for multiple boilers

Weil-McLain · SVF 1500-3000 Series 1, multiple boilers

Multiple SVF boilers can share a common combustion air manifold. Only air piping may be combined; Category IV vent piping must never be combined.

  1. Size the duct at least 1 sq in per 2,000 Btuh of total connected boiler input.
  2. Set minimum free area in the duct (after louver restriction) at 1 sq in per 2,000 Btuh, or divide total MBH by 2.
  3. Example: 3,000 MBH total input gives 1,500 sq in minimum combined air duct.
  4. Never combine Category IV vent piping; flue gas leakage and component damage can result.

Manifolded gas supply for multiple boilers

Weil-McLain · SVF 1500-3000 multiple boiler gas supply

Layout rules when several boilers share one gas line.

  1. Size the gas piping as for a single boiler, using the total input of all appliances.
  2. At each boiler, install a manual shutoff gas valve, a union, and a sediment trap at least 3 in below the tee.
  3. Make sure minimum pressure at each boiler is 3.5 in w.c. with all connected appliances firing.

Manual reset limit tripped

Weil-McLain · All EG / PEG Series 7 boilers

Do not reset a tripped manual reset limit until the cause has been found and fixed. Never bypass a safety limit device, as this can cause unsafe operation.

  1. Find and correct the cause of the trip before resetting.
  2. Never bypass a safety limit device.

Manual section map

Weil-McLain · Ultra Series 4 boilers

Basic installation covers pages 4 to 42 for conventional systems with the Weil-McLain sidewall termination cap. Advanced installation covers pages 44 to 107. Maintenance, parts, dimensions and ratings are on pages 108 to 140.

  1. Read and follow the basic section first.
  2. Use the advanced section for multiple boilers, other system types and alternative vent/air methods.

Model number suffix codes

Weil-McLain · EG-30 to EG-75 and PEG package models

Suffixes on EG-30 to EG-75 model numbers show the ignition type, fuel, boiler type and tankless heater option.

  1. Add PID or PI for electronic ignition. The PID/PI suffix is required with a damper in the US (EG-30 to EG-65) and optional in Canada.
  2. Add N for natural gas.
  3. Add W for a water boiler, or S for a steam boiler.
  4. Add T for a tankless heater, or P for a provisional tankless heater.
  5. For a package boiler, add the P prefix (for example PEG-30-S through PEG-65-S).

Motorized combustion air damper interlock

Weil-McLain · Direct exhaust combustion air openings with motorized dampers

If combustion air openings use motorized dampers, the boiler must not fire unless the damper is proven open.

  1. Wire an isolated contact that proves the damper open in series with the thermostat input to the boiler.
  2. Confirm the boiler will not start with the contact open.
  3. Confirm the boiler shuts down if the damper closes during operation.

Multi-boiler outputs are limited to 120 VAC and 2.0 A

Weil-McLain · Multi-boiler outputs, Example C and all multi-boiler examples

The multi-boiler outputs are 120 VAC maximum at 2.0 A. For any other voltage or higher amperage, use a relay.

  1. Confirm the load voltage and amperage before connecting to an output.
  2. If the load is above 120 VAC or above 2.0 A, add a relay.

Multiple boiler and BMS connections are in the Advanced Manual

Weil-McLain · SVF Series 1 multi-boiler and BMS installs

Expansion module terminal strips EP11 and EP12 (right side) handle multiple boiler communication (up to eight boilers) and BMS communication. Multiple boiler setup is not covered in this manual.

  1. Refer to the SVF Advanced Manual for multi-boiler and BMS wiring and setup.

Multiple boiler placement and wall-mount spacing

Weil-McLain · Ultra models 80–399 in multiple boiler rooms

Clearance and spacing for side-to-side, back-to-back and wall-mounted Ultra boilers.

  1. Use the side-to-side (Figure 56) or back-to-back (Figure 57) layout, or wall mount (Figure 58).
  2. Keep the indicated access clearances. If not possible, use at least the minimum clearances on page 5 and follow local codes.
  3. Build a foundation if the floor is uneven or flooding is possible, sized to the spacing shown.
  4. For wall-mounted boilers, leave about 6 inches between boilers so the jacket door can be removed.
  5. Verify the wall can carry the structural load (see page 50).
  6. Keep a minimum 30-inch walkway or follow local code.

Multiple boiler vent terminations

Weil-McLain · SVF 1500-3000 Series 1, multiple boilers

Each boiler vent connection is terminated separately using the clearances in the manual. Canadian installs need additional code clearances and a ULC S636 kit.

  1. Terminate each vent connection as described in the manual; see Figure 30 (page 37) for typical sidewall layout.
  2. Place wall penetrations to give the minimum clearances in Figure 29 (U.S.) or the CAN/CSA B149.1 clearances (Canada).

Multiple Ultra boiler venting and circulator rules

Weil-McLain · Multiple Ultra Series 4 boiler installations

Rules for installing several Ultra boilers together.

  1. Provide a separate vent pipe and termination for each boiler.
  2. Do not manifold the vent piping.
  3. Combustion air piping may be individually piped or manifolded, per the manifolded air duct figure in the manual.
  4. Keep total circulator amps within the limit: up to three circulators at no more than 2.2 amps each.
Safety: Gas, electrical and refrigerant work must be done by a licensed technician. Turn off power and gas before servicing, never bypass a safety control, and always follow the manufacturer's manual for your exact model.

General guidance for qualified technicians. The manufacturer's installation and service manual and local codes always take priority. Aurora Star Tech is not affiliated with, endorsed by or sponsored by any equipment manufacturer; brand and model names are used only to identify equipment and belong to their owners.