Warming things up…Dialing in your comfort…Almost cozy…
Reliable Heating and Cooling Solutions – Quality Service, Fair Prices, Guaranteed Satisfaction!

Weil-McLain Boiler: Concentric assembly: install rain cap and bird screen last

Updated · by Aurora Star Tech Inc.

Concentric assembly: install rain cap and bird screen last on a Weil-McLain boiler: Do not install the rain cap or bird screen until the assembly is through the roof or wall and all supports are in. Inner and outer pipes must butt correctly at both ends when shortened.

Homeowner with a boiler problem? Call (647) 657-2977 or book a service call — licensed technicians across Vaughan and the GTA.

Applies to: PVC concentric termination

How to fix concentric assembly: install rain cap and bird screen last: step by step

  1. Partially assemble the termination in the order shown in the manual figure.
  2. Cover the end of the assembly with plastic before insertion.
  3. Install the bird screen and rain cap only after supports are installed.
  4. If shortening the inner and outer pipes, confirm they butt correctly at both ends.
Safety: Gas, electrical and refrigerant work must be done by a licensed technician. Turn off power and gas before servicing, never bypass a safety control, and always follow the manufacturer's manual for your exact model.

If the unit shows an error code, look it up: Weil-McLain Boiler codes

More commissioning tips for boiler

Source: ECO Tec Series 3 Boiler Manual, p. 46. Written in our own words as a summary; always check the original manual.

General guidance for qualified technicians. The manufacturer's installation and service manual and local codes always take priority. Aurora Star Tech is not affiliated with, endorsed by or sponsored by any equipment manufacturer; brand and model names are used only to identify equipment and belong to their owners.

Emergency Boiler Repair

647-657-2977