Commissioning: Boiler tips (part 19 of 21)
Short, practical technician tips on commissioning for boiler. Check each one against the manual for your exact model before acting.
AL29-4C stainless vent requires manufacturer adapter
Weil-McLain · Ultra AL29-4C vent installations
AL29-4C vent pipe cannot connect to the boiler with a generic fitting.
- Use only the PVC-to-vent pipe adapter made by the vent pipe manufacturer.
- Install that adapter at the boiler vent connection.
- Install the same adapter at the termination if using the Weil-McLain plate or concentric termination.
Alternate DHW piping: enable the aux pump output
Weil-McLain · Example B DHW piping when DHW is not directly connected
If the DHW circuit is piped elsewhere in the system, the control only works if the system pump runs during DHW calls.
- Set PRIORITY 2 - NETWORK 1 with RUN AUX PUMP/OUTPUT set to YES instead of NO.
Altitude derate for input rate
Weil-McLain · SVF 1500-3000
In the USA, input is derated 4% for each 1000 ft above sea level beyond 2000 ft. In Canada, input is derated 10% for 2000 to 4500 ft. Use the high altitude fan speed settings. Above 4500 ft in Canada, follow provincial authorities. Above 10,000 ft contact Weil-McLain.
- Check the elevation of the install.
- Apply the derate rule for the country.
- Use the high altitude rpm column from the blower speed tables.
Anti-scald valve required for Combi DHW
Weil-McLain · ECO Tec 110 Combi and other Combi models
The DHW outlet of a Combi must have an anti-scald thermostatic mixing valve. Without one, DHW can cause scalding.
- Confirm the anti-scald thermostatic mixing valve is installed, set and working before operating the boiler.
- If no mixing valve is installed, select DISABLE DHW to keep Combi features off while finishing setup.
- After the valve is installed, press ACCEPT. Combi features can be re-enabled later.
Boiler ships for natural gas only
Weil-McLain · ECO Tec Series 3 all models
Propane requires the propane mixer (venturi) and orifice to be installed before connecting to propane.
- Install the propane mixer (venturi) and orifice before connecting to propane (see page 19 of the manual).
Calculate natural gas input from meter
Weil-McLain · Ultra Series 4 gas boilers
Measure time for one cubic foot of gas with other appliances off and the boiler running for 10 minutes. Result should be close to the input on the rating label.
- Run the boiler for 10 minutes.
- Turn off other gas appliances.
- At the gas meter, time how many seconds one cubic foot takes.
- Calculate Btuh = 3600 × 1000 divided by the seconds measured.
- Compare with the input rating on the boiler label.
Calls for heat during blower calibration
Weil-McLain · ECO Tec control during blower calibration
While the blower calibrates, calls for heat are ignored and the boiler stays in standby. A red warning shows on the homeowner screen until calibration ends. After the warning clears, the boiler runs on the wizard settings.
- Do not expect burner operation while the calibrating warning is showing.
- Wait for the red warning to clear before checking heat operation.
- Once cleared, check that the boiler responds to a call for heat.
Carbon monoxide alarm before startup
Weil-McLain · All listed boiler series
The installer must confirm at least one carbon monoxide alarm is installed in the living space before the boiler is put into operation.
- Confirm at least one CO alarm is installed in the living space before startup.
- Install, maintain and replace alarms per the alarm maker's instructions and local codes.
Carbon monoxide alarm required before operation
Weil-McLain · Residential installations
The installer must confirm that at least one carbon monoxide alarm is installed and working in the living space, following the alarm maker's instructions and local codes, before the boiler is put into service.
- Install at least one CO alarm in the residential living space following the alarm maker's instructions and local codes.
- Confirm the alarm works before starting the boiler.
Check for gas leaks before startup
Weil-McLain · All EG / PEG Series 7 boilers
Check for gas leaks before starting the boiler and during first operation. Do not start if there is any sign of a gas leak.
- Before starting, and during initial operation, smell near the floor and around the boiler for gas odorant or any unusual odor.
- Do not continue start-up if there is any sign of a gas leak.
- Repair any leak right away.
Check the boiler location before installing
Weil-McLain · All ECO Tec Series 3 installations
Confirm the site meets code, has suitable wall or floor support, is indoors only, and has nearby water, gas, vent, electrical and condensate connections.
- Confirm local, state, provincial and national codes are followed (NFPA 54 / CSA B149 and NEC / CSA C22.1).
- Confirm the wall can carry the boiler and components, or use a floor stand.
- Confirm the location is indoors only.
- Check nearby connections for system water, gas, venting, electrical power and condensate drain.
- Remove combustibles, gasoline and flammable liquids from the area.
- Protect gas controls from dripping or spraying water during operation or service.
- On a replacement, check and correct sediment, leaks, expansion tank sizing and freeze protection, and flush piping before connecting the new boiler.
Check the derate before setting the boiler
Weil-McLain · SVF 1500-3000 boilers
Vent and air piping length reduces the maximum input. Work out the equivalent length, apply the derate for your model and vent type, and check the input against the site before startup.
- Find the vent/air piping equivalent length in feet.
- Pick the derate formula for the model and vent type (direct exhaust or direct vent).
- Calculate the derate percentage and reduce the maximum input by that amount.
- For elevations above 5,500 ft, follow the high altitude section of the manual for control parameter changes.
Circulator and air separator placement
Weil-McLain · EG water boilers, forced hot water systems
The circulator is supplied by the installer, but wiring is provided with the boiler. Locate it in return or supply piping as needed.
- Supply the circulator separately. Wiring is in the boiler, so it can go in return or supply piping.
- Pipe the expansion tank to the suction side of the circulator when possible.
- Install an air separator in the supply piping.
- Connect the expansion tank to the air separator only if the separator is on the circulator suction side.
- Make the system fill connection at the same point as the expansion tank connection.
Circulator flow rate formula
Weil-McLain · Ultra Series 4 boilers, space heating circuits
Size circulators from the flow needed for the wanted temperature change. Use the flow formula, or the shortcut for a 20 °F drop.
- Flow (gpm) = BTUH / (TD x 500), where TD is the temperature rise or drop in °F.
- Example: 210,000 Btuh at a 20 °F drop gives 21 gpm.
- Shortcut for a 20 °F drop: flow (gpm) = MBH / 10.
- Example: 35,000 Btuh gives 35 / 10 = 3.5 gpm.
Circulator load limits: external relay and power needed
Weil-McLain · Boiler and system circulator wiring in multi-boiler layouts
Boiler circulators and system circulators above the listed ratings need an external relay and separate power from the boiler.
- Provide an external relay and external power to the boiler circulator if its load exceeds 2.2 A FLA, 3.6 A locked rotor, or 16.4 A inrush.
- Provide an external relay and external power to a system circulator if its load exceeds 2.0 A FLA.
Complete the installation and service certificate
Weil-McLain · Ultra Series 4 start-up
The certificate records start-up data, U-Control settings and the boiler identity for the owner.
- Record CO2 and CO at high and low fire, and the fuel type.
- Record the U-Control set-up values for each priority used.
- Record the boiler model, series, CP number and date installed.
- Confirm the installation instructions and check-out sequence were completed.
- Leave the completed certificate with the owner or maintenance person.
Concentric assembly: install rain cap and bird screen last
Weil-McLain · PVC concentric termination
Do not install the rain cap or bird screen until the assembly is through the roof or wall and all supports are in. Inner and outer pipes must butt correctly at both ends when shortened.
- Partially assemble the termination in the order shown in the manual figure.
- Cover the end of the assembly with plastic before insertion.
- Install the bird screen and rain cap only after supports are installed.
- If shortening the inner and outer pipes, confirm they butt correctly at both ends.
Confirm boiler model, altitude and fuel type first
Weil-McLain · All Series 2 110/155/220/299/300/399 boilers with Evergreen Pro control
Boiler model, altitude and fuel type are critical control settings. Setting them wrong can cause severe injury, death or substantial property damage.
- Set the boiler model, altitude and fuel type correctly during setup, either in the WIZARD or manually in the control menus.
- Verify all three settings before leaving the boiler running.
Control features for multi-boiler and external inputs
Weil-McLain · Evergreen Series 2 Pro control
The control has three priority assignments for up to four heat inputs, an outdoor sensor (shipped with boiler), 0-10 VDC input for remote target or modulation, 0-10 VDC output for lead/lag or variable speed pumps, Modbus, and an alarm relay for error/fault.
Control setup Wizard at first startup
Weil-McLain · SVF 1500-3000 Series 1 single boiler
The control setup Wizard is in the BOILER SETTINGS menu that appears at initial startup. It walks through setup for the chosen application, and context-sensitive help explains key items.
- At initial startup, open the BOILER SETTINGS menu.
- Follow the Wizard steps for the application.
- Use context-sensitive help to check the purpose of setup items.
Critical boiler model and altitude settings
Weil-McLain · SVF Series 1 startup
Boiler model and altitude must be set correctly. Incorrect settings can cause severe injury, death or substantial property damage.
- Verify the boiler model on the power-up screen.
- Set the altitude correctly in the Wizard Boiler Settings.
- Set the fuel type (natural gas or propane). The control pauses until fuel is selected.
Critical settings before operation
Weil-McLain · ECO Tec Series 3 control setup
Boiler model, altitude and fuel type must be set correctly; wrong values can cause severe injury, death or property damage. Also set the water temperatures for the system, because excessive temperature can damage property. Protect low-temperature circuits with external limits.
- Set boiler model, altitude and fuel type first. The control pauses until fuel type is selected.
- Confirm the target water temperatures suit the system.
- On multi-temperature systems (radiant slab with baseboard or DHW), wire external limit controls to the low-temperature circuits.
Critical Wizard entries
Weil-McLain · Each boiler in the installation
ALTITUDE and FUEL TYPE are critical and must be entered for each boiler before continuing.
- Enter the correct altitude band for each boiler.
- Select the correct fuel type for each boiler.
- Set WWSD temperature and manual reset high temperature limit as required.
DHW tank sizing and flow in direct-piped layouts
Weil-McLain · Example A DHW piping
DHW tanks piped this way must be sized for the load and use a DHW pump that keeps flow through the boiler and tank in the allowable range.
- Size the DHW tank for the required load.
- Select a DHW pump that gives flow within the allowable range from the pipe sizing table.
- Make sure the DHW circulator handles the pressure drop through the indirect water heater and piping, and gives equal or greater flow than the boiler circulator.
- For some large indirect water heaters, the required flow may need different water heater piping.
Do not use petroleum-based sealing compounds
Weil-McLain · Boiler system piping
Petroleum-based sealing compounds in the system cause severe boiler damage and property damage.
- Use an approved sealant for system joints. Do not use petroleum-based compounds.
Express Setup Example A - application summary
Weil-McLain · Single boiler, multi-zone space heating with indirect DHW, Express Setup Example A
Example A is a multi-zone space heating system with circulators that have no circulator relays, plus direct-piped indirect DHW. The default control settings only apply if the indirect water heater is direct piped to the boiler. Relief valve must be piped to the boiler In connection.
- Confirm the indirect water heater is direct piped to the boiler before relying on default settings.
- Pipe the boiler relief valve to the Boiler In connection, and run relief piping to drain.
- Wire the 120VAC supply to the boiler and install the outdoor sensor.
- Confirm supply and return temperature sensors and the low water cut-off are installed.
Fill the condensate trap before operation
Weil-McLain · Ultra Series 4 condensate system
The condensate trap must hold water whenever the boiler runs, otherwise flue gas can escape through the condensate drain.
- Loosen the hose clamp at the right end of the condensate trap, at the PVC reducing elbow.
- Slide the trap hose off the elbow.
- Fill the trap with fresh water to within an inch of the hose end.
- Reconnect the hose to the elbow and tighten the clamp.
- If the boiler has been out of service a long time, prime the trap by pouring water into the outlet tee while restricting flow in the drain tube.
Fill the condensate trap before startup
Weil-McLain · ECO Tec Series 3 80/110/150/199
The trap must hold water whenever the boiler runs, or flue gas can come out of the condensate drain.
- Remove the test port cap on the vent adapter.
- Pour one cup of clean water into the test port.
- Confirm the condensate trap is full of water.
- Reinstall the test port cap.
Flush the system and protect the heat exchanger from sediment
Weil-McLain · Water boiler piping
Flush the whole system before connecting the boiler to remove sediment. Install a strainer or other sediment removal device if needed. Sediment build-up or corrosion can damage the cast iron heat exchanger.
- Thoroughly flush the system before connecting the boiler.
- Install a strainer or other sediment removal equipment if needed.
Freeze protection fluid requirements
Weil-McLain · Hydronic boiler systems using antifreeze
Never use automotive antifreeze or standard ethylene glycol in the boiler system. Use only freeze protection fluids made for hydronic systems and follow the fluid maker's instructions. Thoroughly clean and flush any old system that used glycol before connecting a new boiler.
- Use only freeze protection fluid made for hydronic systems.
- Follow the antifreeze manufacturer's guidelines.
- Clean and flush the system thoroughly before installing a new boiler if glycol was used before.
General guidance for qualified technicians. The manufacturer's installation and service manual and local codes always take priority. Aurora Star Tech is not affiliated with, endorsed by or sponsored by any equipment manufacturer; brand and model names are used only to identify equipment and belong to their owners.