Viessmann Boiler: Installation requirements for side-wall horizontal venting in Massachusetts
Installation requirements for side-wall horizontal venting in Massachusetts on a Viessmann boiler: For side-wall horizontally vented gas equipment in Massachusetts dwellings where the vent termination is under 7 feet above grade, a hard-wired CO detector with battery backup is required on the installation floor, and a battery-operated or hard-wired CO detector on each additional level. A metal or plastic sign reading 'GAS VENT DIRECTLY BELOW. KEEP CLEAR OF ALL OBSTRUCTIONS' must be mounted at least 8 feet above grade in line with the vent terminal. The detectors must meet NFPA 720 and ANSI/UL 2034 with IAS certification.
Applies to: Side-wall horizontally vented gas equipment, Commonwealth of Massachusetts
How to fix installation requirements for side-wall horizontal venting in massachusetts: step by step
- Confirm a hard-wired CO detector with battery backup is on the installation floor.
- Confirm battery-operated or hard-wired CO detectors are on each additional level.
- If the requirement cannot be met at completion, install a battery-operated CO detector and comply within 30 days.
- Mount the required sign at least 8 feet above grade, in line with the vent terminal.
If the unit shows an error code, look it up: Viessmann Boiler codes
More commissioning tips for boiler
Source: Vitodens 100-W WB1B installation and service instructions, p. 6. Written in our own words as a summary; always check the original manual.
General guidance for qualified technicians. The manufacturer's installation and service manual and local codes always take priority. Aurora Star Tech is not affiliated with, endorsed by or sponsored by any equipment manufacturer; brand and model names are used only to identify equipment and belong to their owners.