Warming things up…Dialing in your comfort…Almost cozy…
Reliable Heating and Cooling Solutions – Quality Service, Fair Prices, Guaranteed Satisfaction!

Rinnai Boiler: Twin pipe horizontal and vertical termination layout

Updated · by Aurora Star Tech Inc.

Twin pipe horizontal and vertical termination layout on a Rinnai boiler: Termination spacing for twin pipe vertical and sidewall terminations, as shown on the layout figures.

Homeowner with a boiler problem? Call (647) 657-2977 or book a service call — licensed technicians across Vaughan and the GTA.

Applies to: Twin pipe termination installation

How to fix twin pipe horizontal and vertical termination layout: step by step

  1. Keep the vertical termination at least 12 in (0.30 m) above grade or anticipated snow level.
  2. Keep the roof termination at least 12 in (0.30 m) minimum from the roof.
  3. Keep the combustion air intake at least 12 in (30 cm) from the exhaust and other openings as shown in the figures.
  4. Keep the sidewall exhaust at least 12 in (30 cm) from the wall and clear of the air intake by 8 in (20 cm) as shown on the sidewall figure.
  5. Do not place the combustion air intake in the area marked as not permitted for intake.
Safety: Gas, electrical and refrigerant work must be done by a licensed technician. Turn off power and gas before servicing, never bypass a safety control, and always follow the manufacturer's manual for your exact model.

If the unit shows an error code, look it up: Rinnai Boiler codes

Source: Rinnai I-Series Plus IP060160C installation and operation manual, p. 40. Written in our own words as a summary; always check the original manual.

General guidance for qualified technicians. The manufacturer's installation and service manual and local codes always take priority. Aurora Star Tech is not affiliated with, endorsed by or sponsored by any equipment manufacturer; brand and model names are used only to identify equipment and belong to their owners.

Emergency Boiler Repair

647-657-2977