Rinnai Boiler: Combustion air and venting checklist
Combustion air and venting checklist on a Rinnai boiler: Confirm these items before leaving the job.
Applies to: All venting and combustion air installations
How to fix combustion air and venting checklist: step by step
- Verify all combustion air opening sizes are correct.
- Confirm combustion air requirements are met for the appliance.
- Confirm the air is not corrosive. If it is, do not use room air.
- Confirm adequate combustion air is available for all appliances in the space.
- Confirm the installation meets the National Fuel Gas Code (ANSI Z223.1/NFPA 54) and local and state rules.
If the unit shows an error code, look it up: Rinnai Boiler codes
More commissioning tips for boiler
Source: Rinnai I-Series Plus IP060160C installation and operation manual, p. 43. Written in our own words as a summary; always check the original manual.
General guidance for qualified technicians. The manufacturer's installation and service manual and local codes always take priority. Aurora Star Tech is not affiliated with, endorsed by or sponsored by any equipment manufacturer; brand and model names are used only to identify equipment and belong to their owners.