Rheem Furnace: Post-conversion checklist
Post-conversion checklist on a Rheem furnace: This is the walk-around before you close up a field conversion on a Rheem 96V or 96MDV. Most call-backs I see after conversions are a kinked hose or a drain that holds water, so go slow on these. Confirm each item against the printed page in the installation instructions.
Applies to: All field conversions
Common causes of post-conversion checklist
- Not a fault call. Final checklist after a field conversion.
How to fix post-conversion checklist: step by step
- Review the conversion steps once more against the manual.
- Verify all hoses are secured and fully seated.
- Confirm all hoses are free of kinks.
- Confirm the condensate plumbing slopes in the direction of water flow.
- Confirm all drain ports are plugged.
- Confirm all clamps and couplings are tightened.
- Confirm the unit has forward pitch.
- Run it and watch for condensate leaks.
If the unit shows an error code, look it up: Rheem Furnace codes
Models
96V
(-)96V060(-)96V070(-)96V085(-)96V10096VA06096VA07096VA08596VA100
96MDV
96MDV06096MDV07096MDV08596MDV100
Source: 96V series installation instructions, p. 16. Written in our own words as a summary; always check the original manual.
General guidance for qualified technicians. The manufacturer's installation and service manual and local codes always take priority. Aurora Star Tech is not affiliated with, endorsed by or sponsored by any equipment manufacturer; brand and model names are used only to identify equipment and belong to their owners.