Rheem Furnace: Direct vent: standard horizontal termination (Options 2 and 3)
Direct vent: standard horizontal termination (Options 2 and 3) on a Rheem furnace: Standard horizontal termination. Intake and exhaust are sized and spaced as shown. The trap is only needed for Option B. Couplings are required on the exterior and optional on the interior.
Applies to: Direct vent standard horizontal termination
How to fix direct vent: standard horizontal termination (options 2 and 3): step by step
- Keep the intake about 12 in from the wall and the exhaust about 6 in minimum from the wall, per the figure.
- Keep the intake to exhaust spacing at 3 in minimum and 5 in maximum.
- Limit 2 in pipe inside the wall to 18 in maximum when using 3 in vent.
- Support horizontal pipe every 4 ft.
- Reduce 3 in pipe to 2 in before the outside wall penetration.
- Use couplings on the exterior of the wall.
- Install the wind deflector vane in a vertical 2 in PVC coupling using PVC solvent.
- Install a trap in the combustion air pipe for Option B (RXGY-D05 for 2 in pipe, RXGY-D06 for 3 in pipe).
- Insulate piping outside the structure as required for local climate.
- Do not use screens on the intake or exhaust.
- Do not install tees at the termination.
- Keep at least 12 in above grade or expected snow level (U.S.).
If the unit shows an error code, look it up: Rheem Furnace codes
Models
96V
(-)96V060(-)96V070(-)96V085(-)96V10096VA06096VA07096VA08596VA100
96MDV
96MDV06096MDV07096MDV08596MDV100
Source: Rheem 96V installation instructions, p. 60. Written in our own words as a summary; always check the original manual.
General guidance for qualified technicians. The manufacturer's installation and service manual and local codes always take priority. Aurora Star Tech is not affiliated with, endorsed by or sponsored by any equipment manufacturer; brand and model names are used only to identify equipment and belong to their owners.