Condensate neutralizer and overflow line on a Rheem furnace: A neutralizer cartridge is needed only where local codes require it. The overflow line is required only when the neutralizer is used and the drain runs to a floor drain.
Applies to: Condensate drain with optional neutralizer
How to fix condensate neutralizer and overflow line: step by step
- Install the neutralizer cartridge in the horizontal position only.
- When routing to a floor drain, also install an overflow line.
- If no floor drain is available, use a condensate pump.
If the unit shows an error code, look it up: Rheem Furnace codes
Models
(-)96V060(-)96V070(-)96V085(-)96V10096VA06096VA07096VA08596VA100
Source: 96V series installation instructions, p. 67. Written in our own words as a summary; always check the original manual.
General guidance for qualified technicians. The manufacturer's installation and service manual and local codes always take priority. Aurora Star Tech is not affiliated with, endorsed by or sponsored by any equipment manufacturer; brand and model names are used only to identify equipment and belong to their owners.