Warming things up…Dialing in your comfort…Almost cozy…
Reliable Heating and Cooling Solutions – Quality Service, Fair Prices, Guaranteed Satisfaction!

Navien Boiler: Vent termination location checks

Updated · by Aurora Star Tech Inc.

Vent termination location checks on a Navien boiler: Terminations must be placed clear of snow, public paths and openings.

Homeowner with a boiler problem? Call (647) 657-2977 or book a service call — licensed technicians across Vaughan and the GTA.

Applies to: NCB700 series

How to fix vent termination location checks: step by step

  1. Keep the termination at least 12 in (305 mm) above the highest expected snow line, or higher if code requires.
  2. Protect the termination from snow blockage where snow accumulates.
  3. Keep the termination away from public walkways, soffit vents and crawl space vents.
  4. Do not store flammable or hazardous items near the termination.
  5. Elbows at the termination end are allowed if vent length, elbow count and clearances are within limits.
Safety: Gas, electrical and refrigerant work must be done by a licensed technician. Turn off power and gas before servicing, never bypass a safety control, and always follow the manufacturer's manual for your exact model.

If the unit shows an error code, look it up: Navien Boiler codes

More commissioning tips for boiler

Source: Navien NCB700 installation and operation manual, p. 62. Written in our own words as a summary; always check the original manual.

General guidance for qualified technicians. The manufacturer's installation and service manual and local codes always take priority. Aurora Star Tech is not affiliated with, endorsed by or sponsored by any equipment manufacturer; brand and model names are used only to identify equipment and belong to their owners.

Emergency Boiler Repair

647-657-2977