Warming things up…Dialing in your comfort…Almost cozy…
Reliable Heating and Cooling Solutions – Quality Service, Fair Prices, Guaranteed Satisfaction!

Navien Boiler: Vent termination and clearances

Updated · by Aurora Star Tech Inc.

Vent termination and clearances on a Navien boiler: Keep the termination clear of snow, ice and blockages. The building owner must keep the intake and exhaust free and schedule maintenance.

Homeowner with a boiler problem? Call (647) 657-2977 or book a service call — licensed technicians across Vaughan and the GTA.

Applies to: NCB700 direct vent terminations

How to fix vent termination and clearances: step by step

  1. Keep the exhaust clear of snow, ice and other blockages.
  2. Maintain the minimum clearances in the manual from openings on adjacent homes and from air intake restrictions.
  3. Angle elbows at the termination only if vent length, elbow count and intake distances still meet the manual limits.
Safety: Gas, electrical and refrigerant work must be done by a licensed technician. Turn off power and gas before servicing, never bypass a safety control, and always follow the manufacturer's manual for your exact model.

If the unit shows an error code, look it up: Navien Boiler codes

Source: Navien NCB700 Installation & Operation Manual, pp. 89-90. Written in our own words as a summary; always check the original manual.

General guidance for qualified technicians. The manufacturer's installation and service manual and local codes always take priority. Aurora Star Tech is not affiliated with, endorsed by or sponsored by any equipment manufacturer; brand and model names are used only to identify equipment and belong to their owners.

Emergency Boiler Repair

647-657-2977