Navien Boiler: Vent pipe pitch and solvent cement joints
Vent pipe pitch and solvent cement joints on a Navien boiler: Horizontal runs must slope up toward the termination. Use approved primer and cement and keep the work area ventilated.
Applies to: NCB700 common vent piping
Common causes of vent pipe pitch and solvent cement joints
- Cold ambient temperatures below 32 °F (0 °C) lengthen cure time
How to fix vent pipe pitch and solvent cement joints: step by step
- Slope horizontal vent sections upward toward the termination at 1/4 in per foot (2% slope).
- Ventilate the work area or wear an approved organic vapor respirator.
- Spread an even layer of solvent cement inside the fitting and on the outside of the pipe.
- Push the pipe into the fitting and twist it a quarter turn.
- Hold the joint together for about 15 seconds until the cement sets.
- Check that the cement was made less than 2 years before use.
- Keep pipe ends straight, chamfered and deburred. Fully tighten all joints.
- Never apply force or impact to pipes after connections are made.
If the unit shows an error code, look it up: Navien Boiler codes
Source: Navien NCB700 Installation & Operation Manual, pp. 92. Written in our own words as a summary; always check the original manual.
General guidance for qualified technicians. The manufacturer's installation and service manual and local codes always take priority. Aurora Star Tech is not affiliated with, endorsed by or sponsored by any equipment manufacturer; brand and model names are used only to identify equipment and belong to their owners.