Installation checklist: venting and combustion air on a Navien boiler: Items to confirm before leaving the boiler. Every item should be a Yes.
Applies to: NCB700 installation
How to fix installation checklist: venting and combustion air: step by step
- Confirm clearances from building openings and intake air vents, and keep service clearances.
- Confirm make-up air is sufficient and free of dust, dirt, corrosive elements and flammable vapors.
- Keep the boiler and vent piping clear of combustible material such as clothing, cleaning supplies and rags.
- Vent with 2 in or 3 in PVC, CPVC, polypropylene, stainless steel, or Type BH special gas vent (ULC-S636) for Category IV in Canada, following local code and the manual.
- Do not use ABS or PVC cellular core pipe for venting.
- Slope the vent up toward termination at 1/4 in per foot (2% grade).
- Support all vent runs and the termination.
- Seal air intake and exhaust connections on flue and vent lines.
- Install vent screen caps on exhaust and intake pipes.
- Check the venting for leaks.
- Confirm vent termination is at least 12 in (300 mm) above exterior grade.
- Confirm total vent length is within the maximum allowed.
If the unit shows an error code, look it up: Navien Boiler codes
More commissioning tips for boiler
Source: Navien NCB700 installation and operation manual, p. 107-109. Written in our own words as a summary; always check the original manual.
General guidance for qualified technicians. The manufacturer's installation and service manual and local codes always take priority. Aurora Star Tech is not affiliated with, endorsed by or sponsored by any equipment manufacturer; brand and model names are used only to identify equipment and belong to their owners.