Navien Boiler: Gas piping layouts and check valves
Gas piping layouts and check valves on a Navien boiler: Typical propane piping layouts show a two-stage system with multiple regulators as the recommended option. Any check valve in the gas line must be sized for the boiler's rated minimum and maximum flow. An undersized check valve will not pass full gas flow and can cause the boiler to run improperly. Flow-limiting valves are also shown in the layouts.
Applies to: NCB700 gas piping
How to fix gas piping layouts and check valves: step by step
- Check the check valve rating against the manufacturer's minimum and maximum flow before installing it in the gas line.
- Use the recommended two-stage layout with multiple regulators where possible.
If the unit shows an error code, look it up: Navien Boiler codes
Source: Navien NCB700 installation & operation manual, p. 225. Written in our own words as a summary; always check the original manual.
General guidance for qualified technicians. The manufacturer's installation and service manual and local codes always take priority. Aurora Star Tech is not affiliated with, endorsed by or sponsored by any equipment manufacturer; brand and model names are used only to identify equipment and belong to their owners.