Warming things up…Dialing in your comfort…Almost cozy…
Reliable Heating and Cooling Solutions – Quality Service, Fair Prices, Guaranteed Satisfaction!

Navien Boiler: External low water cutoff (LWCO) installation

Updated · by Aurora Star Tech Inc.

External low water cutoff (LWCO) installation on a Navien boiler: A separate external LWCO is needed only if local code requires it. The internal device is factory installed.

Homeowner with a boiler problem? Call (647) 657-2977 or book a service call — licensed technicians across Vaughan and the GTA.

Applies to: NCB700 space heating system

How to fix external low water cutoff (lwco) installation: step by step

  1. Check local code to see whether an external LWCO is required
  2. Install the external LWCO at least 152 mm (6 in) above the top of the heat exchanger
  3. Wire the LWCO to the boiler control board using the generic wiring diagram
  4. Inspect and service the external LWCO annually per its instructions
Safety: Gas, electrical and refrigerant work must be done by a licensed technician. Turn off power and gas before servicing, never bypass a safety control, and always follow the manufacturer's manual for your exact model.

If the unit shows an error code, look it up: Navien Boiler codes

Source: Navien NCB700 installation and operation manual, p. 185-186. Written in our own words as a summary; always check the original manual.

General guidance for qualified technicians. The manufacturer's installation and service manual and local codes always take priority. Aurora Star Tech is not affiliated with, endorsed by or sponsored by any equipment manufacturer; brand and model names are used only to identify equipment and belong to their owners.

Emergency Boiler Repair

647-657-2977