Navien Boiler: Check the box contents before installation
Check the box contents before installation on a Navien boiler: Items supplied with the boiler, to be ticked off before installing.
Applies to: All NCB700 models
How to fix check the box contents before installation: step by step
- Confirm the installation and operation manual and user information manual are present.
- Confirm the quick installation guide is present.
- Confirm two 2 in vent outlet caps.
- Confirm four 2 in wall escutcheons.
- Confirm the wall mounting bracket.
- Confirm four self-tapping screws and anchors.
- Confirm the heating system relief valve.
- Confirm the conversion kit (propane and natural gas high altitude). It is fixed inside the casing once the front cover is removed.
- Confirm the universal vent adapter.
- Confirm the outdoor temperature sensor and cable.
If the unit shows an error code, look it up: Navien Boiler codes
More commissioning tips for boiler
Source: navien_ncb700-installation-and-operation-manual.pdf, p. 168. Written in our own words as a summary; always check the original manual.
General guidance for qualified technicians. The manufacturer's installation and service manual and local codes always take priority. Aurora Star Tech is not affiliated with, endorsed by or sponsored by any equipment manufacturer; brand and model names are used only to identify equipment and belong to their owners.