Navien Boiler: Attaching an extension kit (in-line setup)

Updated · by Aurora Star Tech Inc.

Attaching an extension kit (in-line setup) on a Navien boiler: Adds rack sections for more boilers in an in-line layout.

Homeowner with a boiler problem? Call (647) 657-2977 or book a service call — licensed technicians across Vaughan and the GTA.

Applies to: Ready-Link Commercial rack, in-line setup

How to fix attaching an extension kit (in-line setup): step by step

  1. Connect the extension rack to the single frame using the fixed brackets.
  2. Use M10 bolts (3 in and 4 in) for the connection.
  3. Up to 9 extension kits (10 units total) can be assembled.
Safety: Gas, electrical and refrigerant work must be done by a licensed technician. Turn off power and gas before servicing, never bypass a safety control, and always follow the manufacturer's manual for your exact model.

If the unit shows an error code, look it up: Navien Boiler codes

Source: Ready-Link Commercial Rack System installation guide, p. 1, p. 2. Written in our own words as a summary; always check the original manual.

General guidance for qualified technicians. The manufacturer's installation and service manual and local codes always take priority. Aurora Star Tech is not affiliated with, endorsed by or sponsored by any equipment manufacturer; brand and model names are used only to identify equipment and belong to their owners.