Warming things up…Dialing in your comfort…Almost cozy…
Reliable Heating and Cooling Solutions – Quality Service, Fair Prices, Guaranteed Satisfaction!

Navien Boiler: Assembling the foot bar

Updated · by Aurora Star Tech Inc.

Assembling the foot bar on a Navien boiler: Builds each foot bar on the base frame.

Homeowner with a boiler problem? Call (647) 657-2977 or book a service call — licensed technicians across Vaughan and the GTA.

Applies to: Ready-Link Commercial rack, foot bar

How to fix assembling the foot bar: step by step

  1. Align the bolt holes of the lower fixed brackets (front and back) with the bolt holes of the post bar. Place the back bracket on the side near the M10 bolt holes.
  2. Affix the front and back lower brackets to the post bar with 5 M10 bolts (4 in).
  3. Repeat for the second foot bar.
  4. Affix the front lower bracket to the base frame with 6 tapping screws.
  5. Affix the back lower bracket to the base frame with 3 M10 bolts (3 in).
  6. Repeat the last two steps for the other foot bar.
Safety: Gas, electrical and refrigerant work must be done by a licensed technician. Turn off power and gas before servicing, never bypass a safety control, and always follow the manufacturer's manual for your exact model.

If the unit shows an error code, look it up: Navien Boiler codes

Source: Ready-Link Commercial Rack System installation guide, p. 2. Written in our own words as a summary; always check the original manual.

General guidance for qualified technicians. The manufacturer's installation and service manual and local codes always take priority. Aurora Star Tech is not affiliated with, endorsed by or sponsored by any equipment manufacturer; brand and model names are used only to identify equipment and belong to their owners.

Emergency Boiler Repair

647-657-2977