Navien Boiler: Assembling the foot bar
Assembling the foot bar on a Navien boiler: Builds each foot bar on the base frame.
Applies to: Ready-Link Commercial rack, foot bar
How to fix assembling the foot bar: step by step
- Align the bolt holes of the lower fixed brackets (front and back) with the bolt holes of the post bar. Place the back bracket on the side near the M10 bolt holes.
- Affix the front and back lower brackets to the post bar with 5 M10 bolts (4 in).
- Repeat for the second foot bar.
- Affix the front lower bracket to the base frame with 6 tapping screws.
- Affix the back lower bracket to the base frame with 3 M10 bolts (3 in).
- Repeat the last two steps for the other foot bar.
If the unit shows an error code, look it up: Navien Boiler codes
Source: Ready-Link Commercial Rack System installation guide, p. 2. Written in our own words as a summary; always check the original manual.
General guidance for qualified technicians. The manufacturer's installation and service manual and local codes always take priority. Aurora Star Tech is not affiliated with, endorsed by or sponsored by any equipment manufacturer; brand and model names are used only to identify equipment and belong to their owners.