Daikin General: Full set-up: five steps to complete
Full set-up: five steps to complete on a Daikin general: Start-up full set-up runs through five steps: Communication, Personalization, Equipment Set-up, System Optimization and Preferences. All five must be completed and reviewed before set-up is finished so the system is configured correctly for the homeowner.
Applies to: Daikin One+ thermostat, full set-up
How to fix full set-up: five steps to complete: step by step
- Start the full set-up from the start-up menu.
- Complete Communication, Personalization, Equipment Set-up, System Optimization and Preferences in that order.
- Review every step before finishing set-up.
If the unit shows an error code, look it up: Daikin General codes
More commissioning tips for general
Source: Daikin One+ Installation & Commissioning (S21), p. 24. Written in our own words as a summary; always check the original manual.
General guidance for qualified technicians. The manufacturer's installation and service manual and local codes always take priority. Aurora Star Tech is not affiliated with, endorsed by or sponsored by any equipment manufacturer; brand and model names are used only to identify equipment and belong to their owners.