Commissioning: General tips
Short, practical technician tips on commissioning for general. Check each one against the manual for your exact model before acting.
Propane conversion must be verified with combustion analysis
NTI · TRX150, TRX199, TRX199C on propane
The conversion is not complete until combustion is checked. This needs a calibrated CO2/O2 and CO analyzer.
- Install the LP conversion kit per the LP conversion instructions.
- Check operation with a calibrated CO2/O2 and CO combustion analyzer.
- Record the conversion on the boiler label as required.
General guidance for qualified technicians. The manufacturer's installation and service manual and local codes always take priority. Aurora Star Tech is not affiliated with, endorsed by or sponsored by any equipment manufacturer; brand and model names are used only to identify equipment and belong to their owners.