Daikin Air Handler: Wiring requirements for field and replacement wire

Updated · by Aurora Star Tech Inc.

Wiring requirements for field and replacement wire on a Daikin air handler: Follow these rules when replacing original wiring or making field connections on the EEV cased coil.

Homeowner with a air handler problem? Call (647) 657-2977 or book a service call — licensed technicians across Vaughan and the GTA.

Applies to: EEV cased coil and air handler wiring, including fuses F1U and F2U and coil transformer TR1

How to fix wiring requirements for field and replacement wire: step by step

  1. Replace any original wire with wiring rated at least 105°C.
  2. Use copper conductors only.
  3. Ground the unit permanently per N.E.C. and local codes.
  4. Use N.E.C. Class 2 wire for low voltage.
  5. Select the transformer supply tap to match the power supply voltage to the gas furnace or blower unit.
  6. Use manufacturer-specified replacement parts when servicing.
Safety: Gas, electrical and refrigerant work must be done by a licensed technician. Turn off power and gas before servicing, never bypass a safety control, and always follow the manufacturer's manual for your exact model.

If the unit shows an error code, look it up: Daikin Air Handler codes

More other tips for air handler

Source: Daikin DX6VS/DZ6VS service instructions SiUS612209EA, p. 80. Written in our own words as a summary; always check the original manual.

General guidance for qualified technicians. The manufacturer's installation and service manual and local codes always take priority. Aurora Star Tech is not affiliated with, endorsed by or sponsored by any equipment manufacturer; brand and model names are used only to identify equipment and belong to their owners.