Carrier Heat Pump: Refrigerant line installation
Refrigerant line installation on a Carrier heat pump: Units ship with a full R-454B charge based on 25 ft runs. Longer runs need a charge adjustment from the Long Line section.
Applies to: D5CURA refrigerant piping
How to fix refrigerant line installation: step by step
- For runs over 25 ft (7.6 m), review the Long Line Applications section and adjust the charge.
- Do not bury refrigerant lines deeper than 36 in (914 mm).
- Provide at least 6 in (152 mm) of vertical rise to the service valves when lines are buried, to prevent refrigerant migration.
- Do not bury lines in the ground except as allowed above.
- Insulate the suction line with at least 1/2 in (12.7 mm) thick insulation; the liquid line does not need insulation.
- Use closed-cell insulation on all long line runs.
- Isolate interconnecting tubing from the building structure so vibration and noise are not transmitted.
If the unit shows an error code, look it up: Carrier Heat Pump codes
Models
D5CURA + D5MUWAD5CURAH18AAKD5CURAH24AAKD5CURAH30AAKD5CURAH36AAKD5CURAH48AAKD5CURAH60AAK
More commissioning tips for heat pump
Source: D5CURA product data, p. 116. Written in our own words as a summary; always check the original manual.
General guidance for qualified technicians. The manufacturer's installation and service manual and local codes always take priority. Aurora Star Tech is not affiliated with, endorsed by or sponsored by any equipment manufacturer; brand and model names are used only to identify equipment and belong to their owners.