Carrier Heat Pump: Crossover start-up checklist: voltage checks
Crossover start-up checklist: voltage checks on a Carrier heat pump: Record installation data and check supply and communication wiring at each point.
Applies to: Outdoor and indoor unit wiring
How to fix crossover start-up checklist: voltage checks: step by step
- Record site, contractor, job, distributor, unit model and serial numbers.
- Record wire size and type, and confirm no splices or wire nuts between outdoor and indoor units.
- Confirm wiring from the outdoor port to the correct indoor unit.
- At the outdoor disconnect, measure 1(L1) to GND, 2(L2) to GND and 1(L1) to 2(L2).
- At the outdoor terminal block, repeat 1(L1) to GND, 2(L2) to GND and 1(L1) to 2(L2).
- At the indoor unit, measure 1(L1) to GND, 2(L2) to GND, 1(L1) to 2(L2) and 2(L2) to 3(S).
- Record any notes on the checklist.
If the unit shows an error code, look it up: Carrier Heat Pump codes
Models
D5CURA + D5MUWAD5CURAH18AAKD5CURAH24AAKD5CURAH30AAKD5CURAH36AAKD5CURAH48AAKD5CURAH60AAK
Source: D5CURA installation manual, p. 32. Written in our own words as a summary; always check the original manual.
General guidance for qualified technicians. The manufacturer's installation and service manual and local codes always take priority. Aurora Star Tech is not affiliated with, endorsed by or sponsored by any equipment manufacturer; brand and model names are used only to identify equipment and belong to their owners.