Carrier Air Handler: Refrigerant line routing and burial

Updated · by Aurora Star Tech Inc.

Refrigerant line routing and burial on a Carrier air handler: Outdoor units ship with a full R410A charge. Charge, line sizing and capacities assume runs of 25 ft (7.6 m). Lines must not be buried in the ground. If burial is unavoidable, do not bury more than 36 in (914 mm), and give the service valves at least 6 in (152 mm) of vertical rise to prevent refrigerant migration.

Homeowner with a air handler problem? Call (647) 657-2977 or book a service call — licensed technicians across Vaughan and the GTA.

Applies to: DLFULA evaporator coil with outdoor unit

How to fix refrigerant line routing and burial: step by step

  1. Keep line runs near 25 ft (7.6 m) or adjust charge and line sizing to suit.
  2. Do not bury lines in the ground.
  3. If burial cannot be avoided, keep burial depth to 36 in (914 mm) maximum.
  4. Provide at least 6 in (152 mm) vertical rise to the service valves.
Safety: Gas, electrical and refrigerant work must be done by a licensed technician. Turn off power and gas before servicing, never bypass a safety control, and always follow the manufacturer's manual for your exact model.

If the unit shows an error code, look it up: Carrier Air Handler codes

More commissioning tips for air handler

Source: DLFULA product data, p. 7. Written in our own words as a summary; always check the original manual.

General guidance for qualified technicians. The manufacturer's installation and service manual and local codes always take priority. Aurora Star Tech is not affiliated with, endorsed by or sponsored by any equipment manufacturer; brand and model names are used only to identify equipment and belong to their owners.