Carrier Air Handler: Pressure and vacuum test of field refrigerant piping
Pressure and vacuum test of field refrigerant piping on a Carrier air handler: Test field-made piping after installation and before charging. Use inert gas for the pressure test and then vacuum test. Test the indoor side joints for leaks as well.
Applies to: Split system field piping
How to fix pressure and vacuum test of field refrigerant piping: step by step
- Pressure test the low side at its design pressure and the high side at its design pressure. If the sides cannot be isolated, test the whole system at the low side design pressure.
- Hold the test pressure for at least 1 hour after removing the pressure source. The gauge must show no drop. Gauge resolution must not exceed 5% of test pressure.
- Evacuate the system. Isolate it from the pump. The pressure must not rise above 1500 microns within 10 minutes.
- Reach a vacuum of 500 microns or less, or the lower value required by local and national codes.
- Test indoor field joints with a sensitivity of 5 g/year or better at a minimum of 0.25 times maximum allowable pressure. No leak is allowed.
- Pressure test with oxygen-free nitrogen before recharging, and leak test after charging and before leaving the site.
If the unit shows an error code, look it up: Carrier Air Handler codes
Models
D5FUHAH24AAKD5FUHAH36AAKD5FUHAH60AAKEHKMD05KNEHKMD08KNEHKMD10KNEHKMD15KNEHKMD20KNEHKMD25KN
Source: D5FUHA Installation Instructions, p. 6. Written in our own words as a summary; always check the original manual.
General guidance for qualified technicians. The manufacturer's installation and service manual and local codes always take priority. Aurora Star Tech is not affiliated with, endorsed by or sponsored by any equipment manufacturer; brand and model names are used only to identify equipment and belong to their owners.