Warming things up…Dialing in your comfort…Almost cozy…
Reliable Heating and Cooling Solutions – Quality Service, Fair Prices, Guaranteed Satisfaction!

Weil-McLain Boiler: Install the termination plate before the piping and support the run

Updated · by Aurora Star Tech Inc.

Install the termination plate before the piping and support the run on a Weil-McLain boiler: The Weil-McLain termination plate must be mounted before piping is run from the boiler to the termination. Support the piping so it stays sloped and does not sag.

Homeowner with a boiler problem? Call (647) 657-2977 or book a service call — licensed technicians across Vaughan and the GTA.

Applies to: Weil-McLain sidewall termination plate

How to fix install the termination plate before the piping and support the run: step by step

  1. Install pipe supports every 5 feet on both horizontal and vertical runs.
  2. Install a hanger support within 6 inches of any upturn in the piping.
  3. Slope horizontal piping downward toward the boiler at least 1/4 inch per foot.
Safety: Gas, electrical and refrigerant work must be done by a licensed technician. Turn off power and gas before servicing, never bypass a safety control, and always follow the manufacturer's manual for your exact model.

If the unit shows an error code, look it up: Weil-McLain Boiler codes

More commissioning tips for boiler

Source: Ultra Series 4 boiler manual, p. 70. Written in our own words as a summary; always check the original manual.

General guidance for qualified technicians. The manufacturer's installation and service manual and local codes always take priority. Aurora Star Tech is not affiliated with, endorsed by or sponsored by any equipment manufacturer; brand and model names are used only to identify equipment and belong to their owners.

Emergency Boiler Repair

647-657-2977