Full startup check after any maintenance

Weil-McLain · All Ultra Series 4 boilers

Removing and reinstalling components can change boiler behavior, so operation must be proven after any maintenance.

  1. Follow the complete boiler and system startup procedure, beginning on page 35.
  2. Confirm the boiler operates correctly before leaving the job.

Fused disconnect and field wiring

Weil-McLain · EG / PEG Series 7 boilers

A 15 A fused disconnect or service switch is recommended for the 120 VAC supply. If local code does not allow a switch on the boiler, fit a 2x4 cover plate on the boiler junction box and mount the switch remotely.

  1. Check local code before mounting the disconnect on the boiler.
  2. If a remote switch is required, cover the boiler junction box with a 2x4 plate.

Indirect water heater piping for default settings

Weil-McLain · ECO Tec 110 Combi and indirect water heater applications

The default control settings for Example B only apply if the indirect water heater is direct piped to the boiler.

  1. Pipe the indirect water heater directly to the boiler.
  2. Install the DHW temperature and pressure relief valve per the piping diagram.
  3. If the water heater cannot be direct piped, the default settings are not valid and must be set manually.

Install a 100% lockup regulator when inlet pressure can exceed 14 in.

Weil-McLain · ECO Tec Series 3 gas supply

If the supply pressure can go above 14" w.c. at any time, a 100% lockup gas pressure regulator must be installed in the supply line.

  1. Install a 100% lockup regulator in the supply line.
  2. Adjust the lockup regulator to 14" w.c. maximum.

Install the jacket before the return piping

Weil-McLain · EG and PEG boilers

Jacket and piping order, plus knockouts that must be removed first.

  1. Remove the knockout discs listed in Table 4 (page 15) before jacket installation.
  2. On EG boilers with optional tankless or storage heaters, remove the tankless and storage heater knockouts before installing the jacket.
  3. Install the jacket before connecting return piping. Supply piping may go in before or after the jacket.
  4. Connect controls after all piping is connected.

Install the termination plate before the piping and support the run

Weil-McLain · Weil-McLain sidewall termination plate

The Weil-McLain termination plate must be mounted before piping is run from the boiler to the termination. Support the piping so it stays sloped and does not sag.

  1. Install pipe supports every 5 feet on both horizontal and vertical runs.
  2. Install a hanger support within 6 inches of any upturn in the piping.
  3. Slope horizontal piping downward toward the boiler at least 1/4 inch per foot.

Installation and service certificate: fields to complete

Weil-McLain · ECO Tec Series 3 boilers

Record the boiler model/series, install date, Consumer Protection (CP) number, fuel (natural or LP), and Btu input. Confirm the installation instructions were followed and the check-out sequence was performed. Leave the information with the owner or maintenance person. Mark whether the system was assembled from tested components or tested as a complete system.

Installer and maintenance information in wizard

Weil-McLain · ECO Tec control wizard final screens

The last wizard screens hold installer and boiler information for the homeowner and contractor. The Consumer Protection number is preloaded and should be verified. The interval set controls when the maintenance reminder appears.

  1. Enter the installer name and phone number accurately.
  2. Verify the CP number is correct; it is preloaded and normally should not be changed.
  3. Set the maintenance interval to match the normal maintenance schedule.
  4. Confirm all information and press the right arrow to finish the wizard.

Leak check before starting the boiler

Weil-McLain · All Ultra Series 4 gas boilers

Check for gas odour and gas leaks before and during first start-up. Do not start if a leak is suspected.

  1. Use a leak detector or smell near the floor and around the boiler.
  2. Remove the boiler front door and smell inside the enclosure.
  3. Do not proceed if there is any sign of a gas leak; repair it at once.
  4. Check every gas connection with a bubble test and repair any leak before restarting.
  5. Propane only: have the supplier confirm the odorant level before startup and periodically after.

Low water cutoff and high limit requirements

Weil-McLain · EG water boilers

For ASME or Canadian installs, an external high limit is needed. The boiler has a built-in water temperature and low-water sensor on EG water boilers.

  1. Install the external high limit in the supply piping between the boiler and the isolation valve.
  2. Set the external high limit at least 20°F above the operating setpoint. The maximum external high limit setting is 240°F.
  3. The maximum operating limit is 210°F.
  4. Install a low water cutoff when the boiler sits above radiation level or when local codes or insurers require it. An extra external LWCO may be used alongside the built-in monitoring.
  5. Wire per page 31.

Multi-boiler network addressing and detection

Weil-McLain · Multiple boiler networks on Evergreen Pro control

The Master detects the other boilers on the network, but shadow boilers can take 30 seconds to 1 minute to appear. Each shadow boiler needs its own unique network address from 2 through 8.

  1. Wait 30 seconds to 1 minute after powering the network before expecting the Master to show the shadow boilers.
  2. Assign each shadow boiler a unique network address from 2 through 8. Do not reuse an address.
  3. If a boiler drops off the network, leave it connected. The Master reassigns it to its previous position when communication returns.

Multiple boiler placement

Weil-McLain · SVF 1500-3000 Series 1

Several boilers can be placed side by side using the layout in Figure 3 or another layout that keeps all required clearances. Leave room for venting, air and gas piping, condensate components, expansion tank and pump.

  1. Chalk-line boiler locations on the foundation or floor.
  2. Build a foundation sized for the spacing shown if the floor is uneven or flooding is possible.
  3. Uncrate and assemble boilers following the manual.
  4. Maintain service clearances, or at least the minimum clearances on page 7.

Multiple boiler venting

Weil-McLain · ECO Tec Series 3 boilers in multi-boiler installs

Each ECO Tec needs its own separate vent pipe and termination. Vent piping cannot be manifolded. Combustion air piping may be individually piped or manifolded.

Multiple-zone wiring with 3-wire zone valves

Weil-McLain · Multi-zone systems

Do not wire 3-wire zone valves straight to the boiler T-T terminals. Use an isolation relay to protect boiler components.

  1. Do not connect 3-wire zone valves directly to the boiler T-T terminals.
  2. Install an isolation relay.
  3. Connect the zone valve end switch wires to the isolation relay coil.
  4. Connect the isolation relay contact across the boiler T-T terminals.

Name the zones during setup

Weil-McLain · ECO Tec Series 3 boilers with Unity 2.0 control

The control lets you name each hydronic zone or circuit. Clear names make the system easier to trace on later service visits.

  1. Name each zone or circuit on the touchscreen during commissioning.
  2. Confirm the names match the actual circuits before leaving the job.

Near-boiler piping connections and isolation valves

Weil-McLain · EG water boilers

Connection layout and valve placement for EG water boilers.

  1. On EG boilers, connect supply and return to the left end.
  2. Plug all unused connections.
  3. Install isolation valves so the boiler temperature sensor can be serviced. Follow the piping diagram used for the installation.

Network mode selection on first power-up

Weil-McLain · ECO Tec Series 3 control configuration

The first screen after power-up sets whether the boiler works alone or in a multi-boiler network. Only one master is allowed per multi-boiler system.

  1. For a stand-alone boiler choose SINGLE BOILER.
  2. For a multi-boiler network, set one boiler as ON NETWORK AS MASTER. The master controls firing rate and burner-on commands for the network.
  3. Set the other boilers as ON NETWORK AS SHADOW. They follow the master for network calls for heat and control themselves for local calls for heat.
  4. Press the right arrow to continue after selecting.

Network priorities are set on the master boiler only

Weil-McLain · Multi-boiler network

The wizard only lets you configure network priorities on the master. Shadow boilers skip that setup.

  1. Make all network priority settings on the master boiler's wizard.
  2. Check on a shadow boiler that network priority screens are skipped.
  3. Local priorities are set on the boiler the input is wired to.

Never combine vent piping

Weil-McLain · Multiple Evergreen boilers with combined air

Only combustion air piping may be combined on a manifold. Combined vent piping causes flue gas leakage and boiler component damage.

Outdoor sensor mounting and wiring

Weil-McLain · Outdoor reset and WWSD

The outdoor sensor ships with the boiler. It is not required, but it must be installed to use WWSD or outdoor reset. Mount it out of direct sun and away from other heat or cooling sources. Thermostat wire is acceptable.

  1. Mount the sensor on an exterior wall, shielded from sun and from heat or cooling sources.
  2. Connect the sensor leads to P10 terminals 1 and 2.
  3. Use thermostat wire if needed.

Outdoor sensor requirement

Weil-McLain · ECO Tec 80/110/150/199 Series 3

The outdoor sensor supplied with the boiler must be installed unless one of the listed exemptions applies.

  1. Install the supplied outdoor sensor.
  2. Only skip it if an exemption in the manual applies.

Pitch, support and clearance of vent and air piping

Weil-McLain · Direct vent piping

Correct slope and support keep condensate draining back to the boiler and keep the pipe away from combustibles.

  1. Slope vent and air piping continuously toward the boiler at least 1/4 inch per foot of run.
  2. Avoid any sags along the run.
  3. Keep at least 3/16 inch clearance between vent pipe and any combustible wall or material.
  4. Install pipe supports as shown in the figures for the termination type.
  5. Seal wall and floor penetrations per local code.

Priority timing (MAX ON and MIN ON)

Weil-McLain · ECO Tec Series 3 multi-system heating

Priorities decide which system runs first. MAX ON TIME is how long a priority can run before a lower priority's call is served. MIN ON TIME is how long a priority must run before a higher priority or the next lower priority can take over. DHW on priority 1 is a typical example.

  1. Set MAX ON TIME for each priority so no system is held off too long.
  2. Set MIN ON TIME so the boiler does not switch priorities too quickly.
  3. Each priority keeps its own parameters, and the system type sets the defaults. Choose CUSTOM to create a new system type.

Protect the air inlet with a bird screen

Weil-McLain · Ultra air intake

The air inlet opening needs a screen to keep foreign objects out.

  1. Get a bird screen sized for the air inlet opening from WM Technologies.
  2. Insert the screen into the air inlet opening.

Relief valve and pressure/temperature gauge limits

Weil-McLain · All SVF 1500-3000 models

The maximum allowed relief valve setting is 160 PSIG and the boiler ships with a 30 PSIG relief valve. The gauge shipped with the boiler reads to 75 psig and meets ASME requirements only up to a 50 psig relief valve. A higher-rated relief valve needs a gauge with a higher range, and a gauge needing a larger tapping than the 1/4 inch NPT supply tap needs an extra tap placed before any isolation valve.

  1. Never install a relief valve rated above 160 PSIG.
  2. For a relief valve above 50 psig, fit a P/T gauge with a higher pressure range.
  3. If a larger gauge tapping is needed, add the tap in the near-boiler piping before any isolation valve.

Relief valve installation

Weil-McLain · EG/PEG steam boilers

Install the relief valve only in the tapping on top of the boiler, in the vertical position. The valve may discharge large amounts of steam or hot water, so the discharge line is mandatory.

  1. Clean the valve inlet and all connections; remove foreign matter.
  2. Mount the relief valve vertically, connected directly to the top tapping designated in the manual.
  3. Use pipe compound sparingly, or tape, on external threads only.
  4. Use a proper wrench on the wrench pads only; do not use a pipe wrench on the valve body.
  5. Pipe the discharge from the outlet to a safe point with no valve in between.
  6. Make sure the discharge line drains fully and is independently supported and anchored.
  7. End the discharge freely to atmosphere where it is visible and cannot freeze.
  8. Use schedule 40 metal pipe, at least the valve outlet size over its full length. Do not use schedule 80 or extra strong pipe.
  9. Do not cap, plug or obstruct the discharge pipe outlet.
  10. If the discharge is piped upward, provide a condensate drain in the elbow below the vertical run.

Relief valve installation and discharge line

Weil-McLain · EG water boilers

Relief valve is installed vertically in the 3/4 in. tapping on the side of the boiler. A discharge line is mandatory and must follow these rules.

  1. Install the relief valve vertically in the 3/4 in. side tapping.
  2. Follow the manufacturer's tag on the valve.
  3. Keep the discharge line as short as possible and the same size as the valve outlet over its full length.
  4. Pitch the discharge line downward from the valve. End it at least 6 in. above a floor drain where discharge is visible.
  5. End the line plain (not threaded), rated for at least 375°F.
  6. Do not route the discharge where freezing can occur.
  7. Do not put a shutoff valve between the relief valve and boiler or in the discharge line. Do not plug or obstruct the line.
  8. After filling and pressurizing, test the valve by lifting the lever. Confirm it discharges freely. Replace the valve if it does not operate correctly.

Relief valve maximum setting

Weil-McLain · All Ultra Series 4 models

Do not install a relief valve rated above 30 psig. That is the highest allowable relief valve setting for the Ultra boiler.

  1. Check the relief valve pressure rating before installing it on the boiler supply tee.

Relief valve rating limit

Weil-McLain · ECO Tec 80/110/150/199 Series 3

Never install a relief valve rated above 50 psig, which is the maximum allowed for this boiler. Install the relief valve only after the hydrostatic test.

  1. Use a relief valve rated 50 psig or lower.
  2. Fit the relief valve in the 3/4 in elbow on the air elimination/relief valve water pipe connection, with discharge piping per the venting section.

Required codes for installation

Weil-McLain · All installations

Installation must follow local, state, provincial and national codes. In the US this includes the National Fuel Gas Code (ANSI Z223.1/NFPA 54), the National Electrical Code (ANSI/NFPA 70), and ANSI/ASME CSD-1 where the authority having jurisdiction requires it. In Canada use CAN/CSA B149.1 or B149.2.

  1. Confirm which codes the local authority requires.
  2. Follow NFPA 54 and NEC in the US, or CAN/CSA B149.1/B149.2 in Canada.
  3. Apply ANSI/ASME CSD-1 if the authority having jurisdiction requires it.
Safety: Gas, electrical and refrigerant work must be done by a licensed technician. Turn off power and gas before servicing, never bypass a safety control, and always follow the manufacturer's manual for your exact model.

General guidance for qualified technicians. The manufacturer's installation and service manual and local codes always take priority. Aurora Star Tech is not affiliated with, endorsed by or sponsored by any equipment manufacturer; brand and model names are used only to identify equipment and belong to their owners.

Emergency Boiler Repair

647-657-2977