Weil-McLain Boiler: Install the jacket before the return piping

Updated · by Aurora Star Tech Inc.

Install the jacket before the return piping on a Weil-McLain boiler: Jacket and piping order, plus knockouts that must be removed first.

Homeowner with a boiler problem? Call (647) 657-2977 or book a service call — licensed technicians across Vaughan and the GTA.

Applies to: EG and PEG boilers

How to fix install the jacket before the return piping: step by step

  1. Remove the knockout discs listed in Table 4 (page 15) before jacket installation.
  2. On EG boilers with optional tankless or storage heaters, remove the tankless and storage heater knockouts before installing the jacket.
  3. Install the jacket before connecting return piping. Supply piping may go in before or after the jacket.
  4. Connect controls after all piping is connected.
Safety: Gas, electrical and refrigerant work must be done by a licensed technician. Turn off power and gas before servicing, never bypass a safety control, and always follow the manufacturer's manual for your exact model.

If the unit shows an error code, look it up: Weil-McLain Boiler codes

More commissioning tips for boiler

Source: EG/PEG Series 7 boiler manual, p. 18, 20. Written in our own words as a summary; always check the original manual.

General guidance for qualified technicians. The manufacturer's installation and service manual and local codes always take priority. Aurora Star Tech is not affiliated with, endorsed by or sponsored by any equipment manufacturer; brand and model names are used only to identify equipment and belong to their owners.