Viessmann Boiler: High gas supply pressure
High gas supply pressure on a Viessmann boiler: Maximum gas supply pressure is 14 in. w.c. for both natural gas and LPG. If the supply can go above this, a separate gas pressure regulator must go upstream of the heating system.
Applies to: B2HA 112, 150, 399, 530
How to fix high gas supply pressure: step by step
- Measure the incoming gas supply pressure.
- If it can exceed 14 in. w.c., install a separate gas pressure regulator upstream of the boiler.
- Confirm the minimum pressure is 4 in. w.c. for natural gas or 10 in. w.c. for LPG.
If the unit shows an error code, look it up: Viessmann Boiler codes
Models
B2HB 45B2HB 45, 160B2HB 57B2HB 57, 199B2HB 160B2HB 199
More commissioning tips for boiler
Source: Vitodens 200-W B2HA 112, 150, 399, 530 service instructions, p. 103. Written in our own words as a summary; always check the original manual.
General guidance for qualified technicians. The manufacturer's installation and service manual and local codes always take priority. Aurora Star Tech is not affiliated with, endorsed by or sponsored by any equipment manufacturer; brand and model names are used only to identify equipment and belong to their owners.