Warming things up…Dialing in your comfort…Almost cozy…
Reliable Heating and Cooling Solutions – Quality Service, Fair Prices, Guaranteed Satisfaction!

Navien Boiler: UL compliance conditions for gateway installation

Updated · by Aurora Star Tech Inc.

UL compliance conditions for gateway installation on a Navien boiler: Conditions the gateway must meet for UL compliance.

Homeowner with a boiler problem? Call (647) 657-2977 or book a service call — licensed technicians across Vaughan and the GTA.

Applies to: Navien Modbus/BACnet gateway

How to fix ul compliance conditions for gateway installation: step by step

  1. Power the gateway from a listed LPS or Class 2 supply rated for the expected temperature range.
  2. Use interconnecting power connectors and cable that meet local electrical code, the expected temperature range, and the gateway current and voltage rating.
  3. Keep the interconnecting power cable 3.05 m (118.3 in) or shorter, made of VW-1, FT-1 or better rated material.
  4. If the ambient is above 65 °C, install in a restricted access area that needs a key or special tool.
  5. Do not connect this device to a LAN segment that has outdoor wiring.
Safety: Gas, electrical and refrigerant work must be done by a licensed technician. Turn off power and gas before servicing, never bypass a safety control, and always follow the manufacturer's manual for your exact model.

If the unit shows an error code, look it up: Navien Boiler codes

More other tips for boiler

Source: Navien Modbus/BACnet Gateway Start-up Guide, p. 35. Written in our own words as a summary; always check the original manual.

General guidance for qualified technicians. The manufacturer's installation and service manual and local codes always take priority. Aurora Star Tech is not affiliated with, endorsed by or sponsored by any equipment manufacturer; brand and model names are used only to identify equipment and belong to their owners.

Emergency Boiler Repair

647-657-2977