Navien Boiler: Massachusetts side-wall horizontal vent requirements
Massachusetts side-wall horizontal vent requirements on a Navien boiler: Extra rules apply when a side-wall vent terminates less than seven feet above finished grade (including over decks or porches) in Massachusetts.
Applies to: Side-wall horizontally vented installations in Massachusetts
How to fix massachusetts side-wall horizontal vent requirements: step by step
- Confirm a battery or hard-wired CO detector is on the same floor as the appliance, or the next floor up if it is in a crawl space.
- Confirm a CO detector is also present on each habitable level of the dwelling.
- Use only CO detectors listed to ANSI/UL 2034 and certified by IAS that comply with NFPA 720.
- Permanently mount a metal or plastic sign on the outside wall at least eight feet above grade, in line with the vent terminal, reading GAS VENT DIRECTLY BELOW. KEEP CLEAR OF ALL OBSTRUCTIONS, with letters at least 0.5 inch high.
- Installation must be done by a licensed plumber or gas fitter per 248 CMR 4.00 and 5.00.
If the unit shows an error code, look it up: Navien Boiler codes
Source: Navien NCB700 installation and operation manual, p. 157. Written in our own words as a summary; always check the original manual.
General guidance for qualified technicians. The manufacturer's installation and service manual and local codes always take priority. Aurora Star Tech is not affiliated with, endorsed by or sponsored by any equipment manufacturer; brand and model names are used only to identify equipment and belong to their owners.