Navien Boiler: Hydronic piping requirements for applications
Hydronic piping requirements for applications on a Navien boiler: These diagrams show the piping concept only. Local codes, building codes and the expansion tank sizing in the manual take priority. Air must be able to leave the system, so vents and purgers must be placed where air collects. Air elimination devices work best when located high in the system, near the fill point and expansion tank, where pressure is positive.
Applies to: NCB700 hydronic piping
How to fix hydronic piping requirements for applications: step by step
- Use straight pipe with at least 1/2 in (12 mm) inside diameter upstream of all pumps.
- Size the expansion tank according to the manual's expansion tank instructions.
- Install an air separator or air vent to remove air from the system water.
- Install a NaviClean strainer in the system return to catch debris (recommended).
- Use pumps with built-in check valves, or install a check valve on each pump outlet.
- Follow local rules. In Massachusetts, install a vent in the cold water line per 248 CMR. New Jersey has similar requirements.
- Refer to the fill connection section for make-up water connection details.
If the unit shows an error code, look it up: Navien Boiler codes
Source: Navien NCB700 installation and operation manual, p. 195, 198-199. Written in our own words as a summary; always check the original manual.
General guidance for qualified technicians. The manufacturer's installation and service manual and local codes always take priority. Aurora Star Tech is not affiliated with, endorsed by or sponsored by any equipment manufacturer; brand and model names are used only to identify equipment and belong to their owners.