Warming things up…Dialing in your comfort…Almost cozy…
Reliable Heating and Cooling Solutions – Quality Service, Fair Prices, Guaranteed Satisfaction!

Navien Boiler: Exhaust venting installation

Updated · by Aurora Star Tech Inc.

Exhaust venting installation on a Navien boiler: Vent per the approved Category IV system and keep the termination clearances.

Homeowner with a boiler problem? Call (647) 657-2977 or book a service call — licensed technicians across Vaughan and the GTA.

Applies to: NFB-301C/399C

How to fix exhaust venting installation: step by step

  1. Use only approved vent materials: PVC/CPVC Schedule 40 or 80 solid core, approved polypropylene or approved stainless steel (USA).
  2. In Canada, use Type BH special gas vent Class IIA (PVC), IIB (CPVC) or IIC (polypropylene/stainless steel), certified to ULC-S636.
  3. Do not mix components from different vent system manufacturers.
  4. Keep at least 12 in above the highest anticipated snow level or grade for roof or vertical terminations (18 in in Canada).
  5. Keep at least 12 in clearance from any obstruction for the termination.
  6. Keep the vent within the maximum length and elbow limits in the venting table.
Safety: Gas, electrical and refrigerant work must be done by a licensed technician. Turn off power and gas before servicing, never bypass a safety control, and always follow the manufacturer's manual for your exact model.

If the unit shows an error code, look it up: Navien Boiler codes

Source: Navien NFB-C quick installation guide, p. 3. Written in our own words as a summary; always check the original manual.

General guidance for qualified technicians. The manufacturer's installation and service manual and local codes always take priority. Aurora Star Tech is not affiliated with, endorsed by or sponsored by any equipment manufacturer; brand and model names are used only to identify equipment and belong to their owners.

Emergency Boiler Repair

647-657-2977