Updated · by Aurora Star Tech Inc.

Direct vent termination layouts on a Navien boiler: Layouts for vertical and horizontal direct vent terminations and for routing intake and exhaust to different locations.

Homeowner with a boiler problem? Call (647) 657-2977 or book a service call — licensed technicians across Vaughan and the GTA.

Applies to: NCB700-190/060, NCB700-190/080, NCB700-240/110, NCB700-240/130, NCB700-250/150

How to fix direct vent termination layouts: step by step

  1. Vertical direct vent: follow the dimensions on the figure. It shows 12 in minimum and 36 in minimum dimensions with end caps on the terminations. Confirm against the drawing.
  2. Horizontal direct vent: keep at least 12 in horizontal clearance between terminations.
  3. If 12 in horizontal clearance is not possible, keep at least 36 in vertical clearance with the exhaust above the intake. Do not exceed 20 ft total length.
  4. Intake and exhaust may be run to different locations, each with its own end cap.
Safety: Gas, electrical and refrigerant work must be done by a licensed technician. Turn off power and gas before servicing, never bypass a safety control, and always follow the manufacturer's manual for your exact model.

If the unit shows an error code, look it up: Navien Boiler codes

Source: Navien NCB700 installation and operation manual, pp. 101-102. Written in our own words as a summary; always check the original manual.

General guidance for qualified technicians. The manufacturer's installation and service manual and local codes always take priority. Aurora Star Tech is not affiliated with, endorsed by or sponsored by any equipment manufacturer; brand and model names are used only to identify equipment and belong to their owners.