Navien Boiler: Condensate drain piping
Condensate drain piping on a Navien boiler: Route the condensate line from the boiler's 1/2 in NPT drain fitting at the bottom of the unit. Use only corrosion-resistant pipe such as PVC or CPVC, and do not reduce the fitting or line below 1/2 in. The boiler must sit higher than the top of the drain point. The drain line needs a negative slope. Where a condensate pump is used, it must handle at least 2 gallons per hour for each boiler on the system.
Applies to: NCB700 condensate drain
How to fix condensate drain piping: step by step
- Choose a drain option: direct to an external drain, to an external drain through a neutralizer, or from the boiler to a pump and then to the drain.
- Connect a 1/2 in corrosion-resistant drain line to the bottom fitting and run it to a suitable drain.
- If no pump is used, slope the line down at least 1/4 in per foot.
- If a pump is used, confirm it moves at least 2 gal/hr per boiler.
- Fill the condensate trap by pouring water into the flue outlet until water runs out of the condensate drain.
- Keep the line from freezing and from blocking, or condensate can leak from the drain.
If the unit shows an error code, look it up: Navien Boiler codes
Source: Navien NCB700 installation and operation manual, p. 192-193. Written in our own words as a summary; always check the original manual.
General guidance for qualified technicians. The manufacturer's installation and service manual and local codes always take priority. Aurora Star Tech is not affiliated with, endorsed by or sponsored by any equipment manufacturer; brand and model names are used only to identify equipment and belong to their owners.