Warming things up…Dialing in your comfort…Almost cozy…
Reliable Heating and Cooling Solutions – Quality Service, Fair Prices, Guaranteed Satisfaction!

Navien Boiler: Assembling the pipe support brackets

Updated · by Aurora Star Tech Inc.

Assembling the pipe support brackets on a Navien boiler: Mounts heating supply, heating return and gas pipe supports.

Homeowner with a boiler problem? Call (647) 657-2977 or book a service call — licensed technicians across Vaughan and the GTA.

Applies to: Ready-Link Commercial rack, pipe supports

How to fix assembling the pipe support brackets: step by step

  1. Fix the heating supply bracket to a post bar with 3 M10 bolts (3 in).
  2. Fix the heating supply bracket to the front lower bracket with 1 M10 bolt (1 in).
  3. Fix the heating return bracket to a post bar with 3 M10 bolts (3 in).
  4. Fix the heating return bracket to the front lower bracket with 2 M10 bolts (1 in).
  5. Fix the gas pipe bracket to a base frame with 2 M10 bolts (3 in).
  6. Repeat the first three steps for the other foot bar.
Safety: Gas, electrical and refrigerant work must be done by a licensed technician. Turn off power and gas before servicing, never bypass a safety control, and always follow the manufacturer's manual for your exact model.

If the unit shows an error code, look it up: Navien Boiler codes

Source: Ready-Link Commercial Rack System installation guide, p. 2. Written in our own words as a summary; always check the original manual.

General guidance for qualified technicians. The manufacturer's installation and service manual and local codes always take priority. Aurora Star Tech is not affiliated with, endorsed by or sponsored by any equipment manufacturer; brand and model names are used only to identify equipment and belong to their owners.

Emergency Boiler Repair

647-657-2977