Navien Boiler: Assembling the pipe support brackets
Assembling the pipe support brackets on a Navien boiler: Mounts heating supply, heating return and gas pipe supports.
Applies to: Ready-Link Commercial rack, pipe supports
How to fix assembling the pipe support brackets: step by step
- Fix the heating supply bracket to a post bar with 3 M10 bolts (3 in).
- Fix the heating supply bracket to the front lower bracket with 1 M10 bolt (1 in).
- Fix the heating return bracket to a post bar with 3 M10 bolts (3 in).
- Fix the heating return bracket to the front lower bracket with 2 M10 bolts (1 in).
- Fix the gas pipe bracket to a base frame with 2 M10 bolts (3 in).
- Repeat the first three steps for the other foot bar.
If the unit shows an error code, look it up: Navien Boiler codes
Source: Ready-Link Commercial Rack System installation guide, p. 2. Written in our own words as a summary; always check the original manual.
General guidance for qualified technicians. The manufacturer's installation and service manual and local codes always take priority. Aurora Star Tech is not affiliated with, endorsed by or sponsored by any equipment manufacturer; brand and model names are used only to identify equipment and belong to their owners.