Viessmann Boiler: Erase DHW time phases
Erase DHW time phases on a Viessmann boiler: Clears a DHW phase by setting its finishing time to blank. Scanning uses the same display procedure without the adjust buttons.
Applies to: DHW time program
How to fix erase dhw time phases: step by step
- Open the hinged cover on the programming unit.
- Press the heating circuit selector button until it lights up.
- Press the time program button; the DHW time program display appears.
- Press until the required 'DHW phase OFF' shows.
- Press until the finishing time shows '– – : – –'.
- Confirm until the display returns to the boiler temperature.
- Close the hinged cover.
If the unit shows an error code, look it up: Viessmann Boiler codes
Models
More reset & cancel tips for boiler
Source: Vitocontrol-S, VD2/CT3/CM2 operating instructions, p. 20. Written in our own words as a summary; always check the original manual.
General guidance for qualified technicians. The manufacturer's installation and service manual and local codes always take priority. Aurora Star Tech is not affiliated with, endorsed by or sponsored by any equipment manufacturer; brand and model names are used only to identify equipment and belong to their owners.