Carrier Air Handler: Indoor unit location requirements
Indoor unit location requirements on a Carrier air handler: Pick an indoor coil location that is firm, has room for service and for the refrigerant and drain piping, and keeps the air inlet and outlet clear. Keep the unit away from moist places, coastal salt air, bathrooms, laundry rooms, oil drilling or fracking areas, strong electromagnetic fields, and any space that stores flammable materials or gas. Keep the indoor and outdoor units, cables and wires at least 1 m (3 ft) from TVs and radios. In a garage, keep heating elements at least 18 in (46 cm) above the floor.
Applies to: D5FULA indoor coil installs
How to fix indoor unit location requirements: step by step
- Confirm the mounting structure can carry the full weight of the indoor unit.
- Check the site is dry, not coastal, and free of corrosive or flammable vapours.
- Leave room for service access and for the connecting pipe and drain.
- Keep the unit at least 1 m (3 ft) from TVs and radios.
- For garage installs, keep heating elements at least 18 in (46 cm) above the floor.
- Ground the indoor unit per national and local electrical code.
If the unit shows an error code, look it up: Carrier Air Handler codes
Source: D5FULA installation instructions, p. 13. Written in our own words as a summary; always check the original manual.
General guidance for qualified technicians. The manufacturer's installation and service manual and local codes always take priority. Aurora Star Tech is not affiliated with, endorsed by or sponsored by any equipment manufacturer; brand and model names are used only to identify equipment and belong to their owners.