Carrier Air Handler: Horizontal left and right coil installation
Horizontal left and right coil installation on a Carrier air handler: Horizontal coils can sit on a platform, truss, hangers or blocks. The coil cabinet must be level side to side and front to back.
Applies to: D5FULA horizontal installs
How to fix horizontal left and right coil installation: step by step
- Level the coil cabinet side to side and front to back. Up to 1/2 in of extra slope over the length and depth is allowed toward the drain pan connection.
- Right flow: attach field attachment plates to the coil casing with self-tapping screws, then connect the furnace snugly and fasten it.
- Left flow: bend the 4 tabs on the right side of the casing, connect the furnace snugly and fasten it with self-tapping screws.
- For either side, seal the joint airtight with an approved material.
- If the coil is wider than the furnace, use a 4 in minimum transition.
If the unit shows an error code, look it up: Carrier Air Handler codes
Source: Carrier D5FULA installation instructions, p. 22. Written in our own words as a summary; always check the original manual.
General guidance for qualified technicians. The manufacturer's installation and service manual and local codes always take priority. Aurora Star Tech is not affiliated with, endorsed by or sponsored by any equipment manufacturer; brand and model names are used only to identify equipment and belong to their owners.