Carrier Air Handler: Brazing and pressure test
Brazing and pressure test on a Carrier air handler: Nitrogen purge and pressure test after brazing the line set.
Applies to: D5FUAA line set brazing
How to fix brazing and pressure test: step by step
- Set up nitrogen and connect it to the outdoor unit to flow nitrogen while brazing.
- Braze the tubing and fittings for a proper seal.
- Pressurize the system with nitrogen, pressure test to a maximum of 500 psig for at least 60 minutes.
- Insulate the suction line completely, including the outdoor unit valves.
If the unit shows an error code, look it up: Carrier Air Handler codes
Models
45MUAAQ18XX345MUAAQ24XX345MUAAQ30XX345MUAAQ36XX345MUAAQ48XX345MUAAQ60XX3D5FUAA
More commissioning tips for air handler
Source: D5FUAA installation instructions, p. 40. Written in our own words as a summary; always check the original manual.
General guidance for qualified technicians. The manufacturer's installation and service manual and local codes always take priority. Aurora Star Tech is not affiliated with, endorsed by or sponsored by any equipment manufacturer; brand and model names are used only to identify equipment and belong to their owners.