Carrier Air Handler: Braze connections and nitrogen pressure test
Braze connections and nitrogen pressure test on a Carrier air handler: When the air handler connection is brazed, flow nitrogen through the system while brazing, then pressure test. Insulate the suction line completely, including the outdoor unit valves. A flare-to-braze adapter may be used at the air handler.
Applies to: D5FUHA line set brazing
Common causes of braze connections and nitrogen pressure test
- Brazing without nitrogen flow can leave oxidation inside the line set
How to fix braze connections and nitrogen pressure test: step by step
- Cut and deburr the tubing to the outside diameters in the connection table.
- Set up the nitrogen apparatus and connect it to the outdoor unit so nitrogen flows while brazing.
- Braze the tubing and any fittings to get a proper seal.
- Pressurize the system with nitrogen and pressure test to a maximum of 500 psig for at least 60 minutes.
- Insulate the suction line completely, including the outdoor unit valves.
- If a flare-to-braze adapter is used, repeat the same cut, braze and test steps at the adapter.
If the unit shows an error code, look it up: Carrier Air Handler codes
Models
D5FUHAH24AAKD5FUHAH36AAKD5FUHAH60AAKEHKMD05KNEHKMD08KNEHKMD10KNEHKMD15KNEHKMD20KNEHKMD25KN
Source: D5FUHA installation instruction, p. 29. Written in our own words as a summary; always check the original manual.
General guidance for qualified technicians. The manufacturer's installation and service manual and local codes always take priority. Aurora Star Tech is not affiliated with, endorsed by or sponsored by any equipment manufacturer; brand and model names are used only to identify equipment and belong to their owners.