Rheem Furnace: Vertical and horizontal termination height
Vertical and horizontal termination height on a Rheem furnace: Maintain at least 12 in (31 cm) above the highest anticipated snow level or grade, whichever is greater. Canadian installs must follow CSA B149.1-10, Sect. 8.14. Terminations more than 24 in above the roof penetration need additional support. Couplings are required on the exterior and optional on the interior. Reduce 3 in pipe to 2 in before penetrating the roof.
Applies to: Non-direct and direct vent terminations
How to fix vertical and horizontal termination height: step by step
- Confirm termination height above grade and expected snow level.
- Add support for any vent run more than 24 in above the roof penetration.
- Install couplings on the exterior section.
- Reduce 3 in pipe to 2 in before the roof penetration.
If the unit shows an error code, look it up: Rheem Furnace codes
Models
96V
(-)96V060(-)96V070(-)96V085(-)96V10096VA06096VA07096VA08596VA100
96MDV
96MDV06096MDV07096MDV08596MDV100
Source: 96V Series installation instructions, p. 55-56. Written in our own words as a summary; always check the original manual.
General guidance for qualified technicians. The manufacturer's installation and service manual and local codes always take priority. Aurora Star Tech is not affiliated with, endorsed by or sponsored by any equipment manufacturer; brand and model names are used only to identify equipment and belong to their owners.