Trane Furnace: General venting requirements
General venting requirements on a Trane furnace: Furnaces are induced draft, Category IV, positive vent pressure. Vent must be gas tight and water tight.
Applies to: All UH1 and DH1 furnaces
How to fix general venting requirements: step by step
- Vent the furnace to the outdoors. Do not connect it to any vent serving another appliance.
- Ship setting is direct vent with sealed combustion. Combustion air must come through the inlet pipe from outside air for direct vent.
- For nondirect vent (single pipe), combustion air may come from the surrounding area if combustion air requirements are met.
- Use 2 in, 2-1/2 in or 3 in plastic pipe (Table 10). Where venting goes through a masonry chimney that carries another gas appliance's flue products, or where local code requires it, use 3 in Type 29-4C stainless steel instead.
- Keep the snow clear from the vent area (building owner or maintenance provider responsibility).
- Make sure the vent system drains condensate and does not deteriorate.
If the unit shows an error code, look it up: Trane Furnace codes
Source: Trane AUH1B080A9421B installer's manual, p. 18. Written in our own words as a summary; always check the original manual.
General guidance for qualified technicians. The manufacturer's installation and service manual and local codes always take priority. Aurora Star Tech is not affiliated with, endorsed by or sponsored by any equipment manufacturer; brand and model names are used only to identify equipment and belong to their owners.